THERMOMASSEUR
®
|
TMU & TMSU
TM
addendUM To The owner’S ManUal
www.bainultra.com
Printed in Canada. Copyright © September 2012 BainUltra Inc. all rights reserved. 45100572
Some products, specifications, and services mentioned in this manual are described
in pending patent applications or are protected by patents.
supersedes page 11 of owner’s Manual
5
bath on decK
pluMbing installation
iMportant
• Bath must be completely supported by the floor making sure the edge rests entirely on the structure.
• Bath must be levelled.
• Bath is molded with a slope toward drain. If bath is levelled in respect to the deck, the water will
drain completely.
1. InSTallaTIon
* See specification sheet of bath for exceptions.
1-1
Prepare the site to connect the plumbing
and turbine.
1-2
Build the (2” x 3”) wooden structure taking
into account the thickness of the ceramic
tiles and the plywood as well as the height
of the bath.
note:
Plan air intake for turbine.
1-3
Secure plywood into place with screws
around and above structure.
1-4
Cut inside 1 1/2” of the outside dimensions
of the tub.
1-5
ensure bath is levelled and that it fits properly
in cutout.
note:
Protect turbine and accessories
as you insert bath.
1-6
Install desired finishing materials (ceramic
tiles, granit, marble or other) and top
surface and siding of the deck.
1-7
Set bath back into place and conduct
plumbing and turbine connection.
Edge of bath
Ceramic, marble,
granit or other
Plywood
2” x 3”
structure
1
1/2
"
[3.8 cm]
BaTh on deCk - PlUMBInG InSTallaTIon
note
• Baths with aromaCloud
TM
factory installed by BainUltra may require an additional cutout on the
podium for the aromaCloud housing. This extra cutout is required when the housing is less than
1.5 inch from the edge of the bath.