OWNER’S MANUAL |
SKIRTS
38
1 800 463.2187
From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)
Printed in Canada. Copyright © May 2017 BainUltra Inc. All rights reserved. 45220001
Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.
SKIRTS
SJ-3 TMU 5454 / 6060
INSTALLATION
1. PARTS INCLUDED
2. INSTALLATION
1-1
Left panel
1-2
Center panel
1-3
Right panel
1-4
Left toe kick
1-5
Center toe kick
1-6
Right toe kick
1-7
Acrylic footing*
1-8
Wood insert*
1-9
Upper bracket
1-10
Lower bracket
1-11
5/32” Allen key
1-12
Cutting template
1-13
Round head Allen screw
1-14
No. 8 x 1/2” screws
1-15
No. 8 x 2 1/2” screws and washers*
* Parts 1.7, 1.8, and 1.15 are only included for
skirts ordered with the step.
2-1
Screw upper brackets into factory-installed
wood blocks. Brackets must be flush with
the bath edge.
2-2
Follow step 2-1 in the SJ-1 skirt section.
2-3
Cut out cutting template and place it on
floor, aligning the arrow marked “level”
with the line traced on the wall.
1-1
1-4
1-2
1-5
1-3
1-6
1-8
1-7
1-9
1-10
1-13
A-2
A-5
A-7
A-7
A-8
A-1
A-2
A-3
A-6
A-3
A-4
A-13
A-12
A-9
1-11
1-14
1-15
1-12
6
x
6
x
1 2
x
2
x
6
x
2-1
2-3
SJ-3 TMU 5454/6060 - INSTALLATION