background image

BAK Thermoplastic Welding Technology AG  

OPERATING MANUAL 

Summary of Contents for ErOn BL

Page 1: ...1 BAK Thermoplastic Welding Technology AG OPERATING MANUAL ...

Page 2: ...r within or outside the device is dangerous Only use extension cables with protective earth conductor and a minimum diameter of 2 5 mm The voltage rating stated on the nameplate must correspond to the mains voltage Consult your local electricity supplier if necessary For personal protection the device must be connected to a residual current circuit breaker before using it on construction sites Do ...

Page 3: ...ing elements Note This operating manual must be available to the installation and operating personnel at all times Read these operating instructions carefully before installing and using the device Copyright This document must not be disclosed to third parties without the explicit written approval of BAK Any forms of reproduction or copying and electronic storage are prohibited INTENDED USE Heatin...

Page 4: ...ustment 7 Heater tube 4 Handle OPERATING CONDITION If it is not possible to start the motor a reset is needed o Reset Turn off main switch wait for 3 seconds Turn on main switch Maintain the maximal allowed impedance Zmax 0 301 j0 188 and if necessary consult the power supply company As required push fit appropriate nozzle or reflector Connect the tool to the mains Adjust the hot air temperature b...

Page 5: ...L Voltage V 230 120 Frequency Hz 50 60 Power consumption W 2300 2700 3400 Temperature C 20 650 stepless controlled Max air flow l min 600 Noise level EN ISO 11203 dB A ca 3000 Dimensions mm L x W x H 320 x 94 handle 64 Weight with 5 m cable kg 1 5 with 3m cord Protection class IP20 Conformity symbol Protection type I Electrical safety double insulated MAINTENANCE Airfilter 5 should be cleaned with...

Page 6: ...61 22 50 Telefax 0041 041 661 22 51 E Mail info bak ag com ACCESSORIES Optimum results will be achieved when BAK accessories and spare parts are used Please refer to our brochures for additional information SERVICE AND REPAIR The hot air tool should be checked by an authorised service centre approx every 1000 operating hours Repairs have to be carried out exclusively by BAK authorised service cent...

Page 7: ... carrier The seller must be promptly informed in writing Storage In the case of temporary storage the welding machine should be kept packed and must be protected from moisture In the case of damage resulting from improper storage no warranty claim will be honoured DISPOSAL Power tools accessories and packaging should be sorted for environmental friendly recycling Do not dispose power tools togethe...

Reviews: