background image

 

 

 

BA RoofOn V30 R16 12_2012 GB mit CE BAK.doc 

 

 

MAINTENANCE 

 

 

Clean the welding nozzle with a wire brush (5201330). 

 

Check power cable and plug for electrical and mechanical damage. 

 

SERVICE AND REPAIR 

 

The welding machine should be checked by an authorised service centre approx. every 1000 operating 
hours. 
Repairs have to be carried out exclusively by 

HERZ

 

authorised service centres. 

 

SHIPPING 

 

For repairs, please return the device appropriately packed for transport to your next 

HERZ

 

service centre. 

 

!!! SHIPPING MUST BE PAID!!! 

 

Technical modifications reserved. In case of doubt, consultation with 

HERZ

 

is required. Images and drawings 

may deviate from the original. Changes reserved. 

 

TRANSPORT - HANDLING - STORAGE 

 

Transport: 

The welding machine is packed appropriately and must be protected from moisture. 

Handling:

 

The shipment must be checked for completeness and transport damage. In the event of transport damage, 
the defect must be confirmed in writing at the time of the delivery by the carrier. The seller must be promptly 
informed in writing! 

Storage: 

In the case of temporary storage, the welding machine should be kept packed and must be protected from 
moisture. In the case of damage resulting from improper storage, no warranty claim will be honoured. 

 

DISPOSAL 

 

 

 

Power tools, accessories and packaging should be sorted for environmentally friendly 
recycling. 

Do not dispose of power tools together with household waste! 

Only EU countries: According to the European Directive 2002/96/EC on  waste electrical and 
electronic  equipment  and  its  incorporation  into  national  law,  power  tools  that  are  no  longer 
operational must be separately collected and sent to be environmentally friendly recycled. 

 

TECHNICAL DATA 

 

Technical Data 

 

RoofOn [*proximate] 

Voltage 

120 

230 

Frequency 

Hz 

50 / 60 

Power consumption 

2’700 

3’400 

Max. power input 

22,5 

15,0 

Temperature 

°C 

20 – 600 

Drive 

m/min 

 Standard 0,6 – 12,0 / Digital 0,0 – 12,0 

Max. air flow (20 °C) 

l/min 

500 

Noise level (EN ISO 
11203) 

dB(A) 

64 

Dimensions 

mm (L x W x H) 

460 x 330 x 850 

Weight with 5 m cable 

kg 

ca. 14,5[*26,0] 

Protection class 

 

IP20 

Conformity symbol 

 

Protection type I 

 

 

Other voltages on request. 

 

Summary of Contents for ROOFON

Page 1: ...OPERATING MANUAL BA RoofOn V30 R16 12_2012 GB mit CE BAK doc RoofOn RoofOn R Edge...

Page 2: ...rotection the device must be connected to a residual current circuit breaker before using it on construction sites Do not leave the device unobserved Hot air radiation of the hot air device may ignite...

Page 3: ...or when advised how to use the device by that person Children must be supervised in order to ensure that they do not play with the device Because of the enormous fire danger the operating personnel mu...

Page 4: ...ed risks to the life and health of the operating personnel when the machine is used in accordance with its intended use DANGER ZONE The main danger zone of the welding machine is the nozzle which can...

Page 5: ...rive starts automatically when the welding machine is swivelled in The welding speed is adjusted with the potentiometer or control unit depending on the plastic film geomembrane liner or weather condi...

Page 6: ...NCE AND SUPPORT The HERZ group and its authorised service centres offer free support and assistance in the area of applications technology Our specialists will be pleased to help you ACCESSORIES Avail...

Page 7: ...elivery by the carrier The seller must be promptly informed in writing Storage In the case of temporary storage the welding machine should be kept packed and must be protected from moisture In the cas...

Page 8: ...stment 50 100 4 Welding speed adjustment 0 6 12 5 m min 4 1 Welding speed adjustment 0 6 12 5 m min 4 1 1 Reduce speed 4 1 2 Increase speed 5 Heating ON OFF 6 Welding temperature adjustment 6 1 Weldin...

Page 9: ...Allen keys SW3 5 8 0 Assembly instructions for additional weight 8 1 Switch off the device unplug it and let it cool down if necessary 8 2 Screw out the M6x10 threaded bolt Allen SW3 8 3 Add additiona...

Page 10: ...uired tools Allen key SW6 9 0 Running wheel relocation edge roller assembly 9 1 Switch off device 9 2 Unplug device 9 3 Lay device on its side 9 4 Remove Allen screw of the guide handle SW6 9 5 Assemb...

Page 11: ...SPARE PARTS DRAWINGS Heating element and tube adapter Lifting device 5230043 5230044 5230045 5230169 5202010 6101760 5101270 5113269 5113267 5230054 5230112 5280284 5230036 5230055 5230037 5230097 51...

Page 12: ...054 Push rod tightener for lifting device 1 5230112 Fastening angle for lifting device 1 5280284 Rounded head screw M5x20 Torx 3 5230036 Centring push rod for lifting device 1 5230055 Guide roller 3 5...

Page 13: ...3 3 2008 EN61000 6 2 2005 EN61000 6 4 2007 A1 2011 EN60335 1 2012 _____________________________ Mag Marion Herz Degenkolb Gerente Sch nberg 30 01 2011 Portugu s Declara o de conformidade HERZ GmbH A...

Page 14: ...007 A1 2011 EN60335 1 2012 _____________________________ Mag Marion Herz Degenkolb ener ldirektors Sch nberg 30 01 2011 Dansk Conformiteitsverklaring HERZ GmbH A 6141 Sch nberg Austria bekr fter at de...

Page 15: ...ag Marion Herz Degenkolb Sch nberg 30 01 2011 Norsk Deklaration av samsvarsm ling fra HERZ GmbH A 6141 Sch nberg bekrefter at denne modellen av v rt solgte produkt oppfyller kravene i f lgende EF dire...

Page 16: ...16 BA RoofOn V30 R16 12_2012 GB mit CE BAK doc...

Reviews: