Masoneilan 4700P/E & 4800P/E Positioners Manual | 33
© 2021 Baker Hughes Company. All rights reserved.
Split Range Operation
Split ranging permits operation of two valves in sequence from one 4-20 mA control signal. To
accomplish this with the 4700E/4800E, the two positioners are connected in series as shown
in
Figure 15, with the actual split ranging done by proper cam segment selection per tables in
“Cam Lobe Selection and Lever Arm Orientation” on page 53.
NOTE
With this configuration, the voltage burden of the 4-20
mA controller is 10 V instead of 5 V.
Figure 15 - Split Range
Summary of Contents for Masoneilan 4700P
Page 16: ...2021 Baker Hughes Company All rights reserved 16 Baker Hughes Figure 5 87 88 Actuator...
Page 30: ...2021 Baker Hughes Company All rights reserved 30 Baker Hughes Figure 12 FM Installation...
Page 32: ...2021 Baker Hughes Company All rights reserved 32 Baker Hughes Figure 14 ATEX Installation...
Page 64: ...2021 Baker Hughes Company All rights reserved 64 Baker Hughes NOTES...