© 2020 Baker Hughes Company. All rights reserved
.
=
Masoneilan SVI II AP Digital Positioner Quick Start Guide | 40
Installing the SVI II AP for Double- Acting
Operation
This section explains how to mount the SVI II AP for the 84/85/
86 kit for double-acting valve positioner configurations.
To mount the kit:
1. Set valve to the closed position.
2. Install the mounting assembly to the yoke (Figure
18) using
helical spring washer 5/16, flat washer 5/16 and hex screw
5/16-18x44.5 [1.75] LG.
Figure 18
84/85/86 Actuator
NOTE
Mount all components snug enough to stay in place
but loose enough to tap with rubber hammer into final
position.
Lever
Rod-
end
Kit
Mount
Summary of Contents for Masoneilan SVI II AP Series
Page 6: ...This page intentionally left blank ...
Page 76: ...This page intentionally left blank ...
Page 82: ...This page intentionally left blank ...
Page 108: ...This page intentionally left blank ...
Page 122: ...This page intentionally left blank ...