© 2018 Baker Hughes, a GE company, LLC. All rights reserved
.
Masoneilan SVI II AP Digital Positioner Quick Start Guide
=
|
37
5. Ensure the turnbuckle assembly is parallel to the stem and the magnets are in the
valve closed position (Figure 21) and connect to take-off bracket.
Figure 21
Magnet Position with Valve Closed
6. Verify lever is in correct position with valve closed. Adjust rod-ends, if necessary.
Figure 22
Lever Alignment
7. Mount the SVI-II with M6-1 screws.
8. Cycle the valve open to close verifying proper components movement and that
rod-ends move free and clear from other components.
Summary of Contents for Masoneilan SVI II AP
Page 6: ...This page intentionally left blank...
Page 10: ...This page intentionally left blank...
Page 68: ...This page intentionally left blank...
Page 90: ...2018 Baker Hughes a GE company LLC All rights reserved 90 BHGE Spare Parts...
Page 92: ...2018 Baker Hughes a GE company LLC All rights reserved 92 BHGE...
Page 94: ...This page intentionally left blank...
Page 102: ...This page intentionally left blank...
Page 105: ...This page intentionally left blank...
Page 106: ...This page intentionally left blank...
Page 107: ...This page intentionally left blank...