© 2018 Baker Hughes, a GE company, LLC. All rights reserved.
4 |
=
BHGE
Compliance Voltage in Single Drop Current Mode ..................................................................45
Verify Wiring and Connections .........................................................................................................45
3: Check Out, Configuration and Calibration ....................................47
Overview .....................................................................................................................................47
Check Out Procedures ...........................................................................................................................47
Inspecting Actuator, Linkages, or Rotary Adapter ...................................................................48
Verifying Mounting and Linkage Adjustment ............................................................................48
Checking the Magnet ............................................................................................................................48
Checking the Air Supply .......................................................................................................................50
Checking the Electronic Module Connections ...........................................................................50
Operational Checkout............................................................................................................................52
Connecting to the Current Source ..................................................................................................52
Powering Up the SVI II AP ....................................................................................................................52
Configuration .............................................................................................................................................54
Configuration with Pushbuttons ......................................................................................................56
Viewing Status Messages ....................................................................................................................58
VIEW DATA Settings ...............................................................................................................................58
Calibration ...................................................................................................................................................59
Check-out with a HART® Handheld Communicator ..............................................................63
4: Maintenance ........................................................................................65
SVI II AP Maintenance ............................................................................................................................65
Repair ............................................................................................................................................................65
Tools Needed for Cover Replacement ...........................................................................................65
Display Cover Removal and Installation ......................................................................................66
A: Specifications and References .........................................................69
Physical and Operational Specifications.......................................................................... 69
Hazardous Location Installation.......................................................................................................76
Spare Parts..................................................................................................................................................90
B: Optional Switch Load Limits ............................................................95
General Configuration Notes..............................................................................................................95
C: Burst Mode Operations .....................................................................99
D: Determining an SVI Positioner Compliance Voltage in a Control
System ......................................................................................................103
Compliance Test Set-Up .......................................................................................................................103
Summary of Contents for Masoneilan SVI II AP
Page 6: ...This page intentionally left blank...
Page 10: ...This page intentionally left blank...
Page 68: ...This page intentionally left blank...
Page 90: ...2018 Baker Hughes a GE company LLC All rights reserved 90 BHGE Spare Parts...
Page 92: ...2018 Baker Hughes a GE company LLC All rights reserved 92 BHGE...
Page 94: ...This page intentionally left blank...
Page 102: ...This page intentionally left blank...
Page 105: ...This page intentionally left blank...
Page 106: ...This page intentionally left blank...
Page 107: ...This page intentionally left blank...