© 2018 Baker Hughes, a GE company, LLC. All rights reserved
.
Masoneilan SVI II AP Digital Positioner Quick Start Guide
=
|
51
Confirm the correctness of all applicable connections to the electronics
module.
Figure 27
Connections to Electronics Module (via Terminal Board)
NOTE
When an SVI II AP is turned on it is advisable to apply the air
supply before applying the electrical input signal.
NOTE
The PV (Process Variable is not used for the SVI II AP. The Digital
Input (DI) is activated using SMARTs Assistant, which is
downloaded at
https://www.geoilandgas.com/file-download-
search.
Solid State Switch #1 and #2
Optional
Optional
4- 20 mA Out Position Transmit
Optional
Optional
Table 6: SVI II AP Models and Functionality (Continued)
Available Functionality
Positioner Model Number
Display
Remote
Process Variable
Position Retransmit
Position
Input
Configuration Lock
Jumper
4- 20 mA
Input Signal
Solid State Switch SW #1
Solid State Switch SW #2
Sensor
Digital Input
(not used)
(enabled using
SMARTs
Assistant))
Summary of Contents for Masoneilan SVI II AP
Page 6: ...This page intentionally left blank...
Page 10: ...This page intentionally left blank...
Page 68: ...This page intentionally left blank...
Page 90: ...2018 Baker Hughes a GE company LLC All rights reserved 90 BHGE Spare Parts...
Page 92: ...2018 Baker Hughes a GE company LLC All rights reserved 92 BHGE...
Page 94: ...This page intentionally left blank...
Page 102: ...This page intentionally left blank...
Page 105: ...This page intentionally left blank...
Page 106: ...This page intentionally left blank...
Page 107: ...This page intentionally left blank...