12 | Baker Hughes
© 2021 Baker Hughes Company. All rights reserved.
Tubing and Air Supply to SVI3
1.
Install the tubing to the SVI3 air supply port through air regulator as shown in Figure 13.
2.
Ensure that there is no pinches in the tubing and all the fittings are leak free.
3. Confirm that the air regulator is adjusted to the lowest setting prior to turning on air supply.
4.
Turn on the air supply and adjust the air regulator to reach required actuator supply
pressure. Maximum air supply pressure should not exceed actuator design pressure or
SVI3 pressure limit (max.120 psi).
SVI3 Air Supply Port
Output to Actuator
Air Regulator
Figure 13 - Air Supply