background image

FLOOR MODEL GAS DECK OVEN OPERATION MANUAL

4

INSTALLATION INSTRUCTIONS

Installation With Casters (Optional):

Four Casters (two with wheel brakes) and the mounting 
hardware is packed and included in the shipment if 
ordered. Install casters with wheel brakes on the front of 
the unit.

Installation should be made with a connector that 
complies with the latest edition of the Standard 
for Connectors for Movable Gas Appliances ANSI 
Z21.69 in the USA (CAN CGA-6.16 in Canada) 
and a quick disconnect device that complies 
with the latest edition of the Standard for Quick 
Disconnect Devices for use with gas fuel ANSI 
Z21.41 in the USA (CAN CGA 1-6.9 in Canada) 
and adequate means must be provided to limit 
the movement of the appliance without depending 
on the connector and any quick disconnect device 
or its associated piping. 

NOTICE

The restraint should be attached to the rear legs of the 
oven on which casters are mounted. lf disconnection of 
the restraint is necessary to move the oven for servicing 
needs, the restraint should be reconnected after the 
appliance has been returned to its originally installed 
position.

Pizza Deck:

(a) Remove all packing material, samples, shims, etc. 

from the baking chamber leaving the two metal 
hearth liner sheets on the baking chamber floor. 
Make sure that the two metal hearth liner sheets 
cover the entire bottom of the chamber.

(b) Depending on the model, three or five slabs of 

the Pizza Deck are provided with the oven. This 
material is heavy, and fragile, and should be 
handled carefully.

A. Three Deck Installation:

(a)  Slide one deck into the baking chamber and 

push it as far as possible to one side.

(b)  Slide the second deck into the baking chamber 

on the side opposite to the first deck.

(c)  Slide the third deck into the center section.

(d)  Use metal shims to level the decks.

(e)  Use wedges in the back and on the sides of the 

deck if the decks are loose. The three decks 
should be tight against each other with no gap 
between them (See Fig. 7).

(f)  Put the hearth trim in place between the deck 

and the door.

DO NOT install the baking stones until you have 
read the pre-drying instructions. Failure to pre-dry 
the stones can result in severe damage to your 
oven and void the manufacturer’s warranty. 

WARNING

Figure 7

B. Five Deck Installation:

(a)  Slide one deck into the baking chamber and 

push it as far as possible to one side.

(b)  Slide the second deck into the baking 

chamber on the side opposite to the first deck.

(c)  Slide the third and the fourth decks in the 

same as the first two decks.

(d)  Slide the fifth deck into the center section.

Summary of Contents for Superdeck Y600 Series

Page 1: ...BUILT BY CRAFTSMEN TESTED BY TIME SERIES Y600 Y800 OPERATION MANUAL SUPERDECK SERIES GAS DECK OVENS...

Page 2: ...hall be obtained from the local gas supplier NOTICE BAKERS PRIDE OVEN COMPANY LLC 1307 N Watters Rd Suite 180 Allen TX 75013 Phone 800 527 2100 Fax 914 576 0605 www bakerspride com P N U4282A REV B 03...

Page 3: ...HTING PROCEDURE 8 BREAKING IN 8 BAKING 8 RECOMMENDED OPERATING PROCEDURE 8 HELPFUL HINTS 9 CLEANING AND MAINTENANCE 9 OVEN EXTERIOR 9 CONTROL PANEL 9 FLUE VENT 10 OVEN INTERIOR 10 A BAKING CHAMBER 10...

Page 4: ...891 WARNING Clearances Combustible Construction Non Combustible Construction Minimum Clearance from Left Side 3 75mm 0 Minimum Clearance from Right Side 1 25mm 2 Minimum Clearance from Rear 3 75mm 2 5...

Page 5: ...4 b Bolt side braces and rear brace to legs using supplied 3 8 16 x 3 4 bolts lock washer and flat washer See Fig 5 c Using proper lifting equipment lower the oven from its back to its bottom Lift th...

Page 6: ...rom the baking chamber leaving the two metal hearth liner sheets on the baking chamber floor Make sure that the two metal hearth liner sheets cover the entire bottom of the chamber b Depending on the...

Page 7: ...t be electrically grounded in accordance with local codes and or the latest edition of the National Electric Code ANSI NFPA 70 in USA Canadian Electric Code CSAC22 2 in Canada b In Europe appliance mu...

Page 8: ...the safety valve The safety pilot valve is in effect a two stage control After initial lighting the pilot burner stays on without the gas cock dial being held pressed in After 1 2 minutes the valve o...

Page 9: ...appearance Should the Burner fail to light check to see if there is a problem with the gas supply lf there are other appliances on the same line shut them off temporarily and see if the burner comes...

Page 10: ...dients and temperature that gives the right bake for your crust sauce and cheese combination and your customer s taste mark and keep it Deck baking refers to baking Pizza directly on the deck Generall...

Page 11: ...hen choosing pans be sure to pick a pan which is closest in height of your product Dark color pans and screens transfer heat better than light colored aluminum pans or screens They must be seasoned be...

Page 12: ...least 1 2 hour This will burn off the food spilled onto the baking decks during day s production and turn it into ash This ash can be brushed off the next day before turning the oven on The baking dec...

Page 13: ...ro slides are open too much Close micro slides pull out until desired combination is reached This will help decrease top heat Bottom of pies burn before toppings are cooked Deck temperature too hot es...

Page 14: ...FLOOR MODEL GAS DECK OVEN OPERATION MANUAL 12 EXPLODED VIEWS PARTS LISTS Exploded View Y600 Y800...

Page 15: ...FLOOR MODEL GAS DECK OVEN OPERATION MANUAL 13 EXPLODED VIEWS PARTS LISTS Exploded View Y600 Y800 Controls Burners...

Page 16: ...LEFT ACCESS DOOR 36 S1004Y 1 LEG 30 SET OF 4 37 S1120Y 1 LEG CASTER 30 SET OF 4 38 S1003Y 1 LEG 16 SET OF 4 39 S1119Y 1 LEG CASTER 16 SET OF 4 40 M1242P 1 CONTROL ASSY Y600 41 N5014A 1 NIPPLE 1 2 X 5...

Page 17: ...LEFT ACCESS DOOR 36 S1004Y 1 LEG 30 SET OF 4 37 S1120Y 1 LEG CASTER 30 SET OF 4 38 S1003Y 1 LEG 16 SET OF 4 39 S1119Y 1 LEG CASTER 16 SET OF 4 40 M1242P 1 CONTROL ASSY Y600 41 N5014A 1 NIPPLE 1 2 X 5...

Page 18: ...FLOOR MODEL GAS DECK OVEN OPERATION MANUAL 16 WIRING DIAGRAM Wiring Diagram Gas Oven Series 120V 208 OR 230V 1PH Auto Starter Option...

Page 19: ...Stones and Valves are covered for a period of SIX MONTHS All Ceramic Baking Decks are covered for a period of THREE MONTHS The installation of these replacement decks is the responsibility of the purc...

Page 20: ...ANT FOR FUTURE REFERENCE Please complete this information and retain this manual for the life of the equipment For Warranty Service and or Parts this information is required Model Number Serial Number...

Page 21: ...19 NOTES...

Page 22: ...nouncements and events on social media 1307 N Watters Rd Ste 180 Allen Texas 75013 Phone 800 527 2100 Fax 914 576 0605 bakerspride com 4 15 2019 Social icon Square Only use blue and or white For more...

Page 23: ...BUILT BY CRAFTSMEN TESTED BY TIME S RIES Y600 Y800 OP RATION MANUELLE FOUR SOLES AU GAZ S RIES SUPERDECK...

Page 24: ...RS PRIDE OVEN COMPANY LLC 1307 N route Watters Suite 180 Allen TX 75013 T l phone 800 527 2100 T l copieur 914 576 0605 www bakerspride com P N U4282A R V B 03 2021 INSTRUCTIONS IMPORTANTES Une fois q...

Page 25: ...7 INSTRUCTIONS D UTILISATION 8 PROC DURE D ALLUMAGE 8 TRENNER 8 CUISSON 8 PROC DURE D UTILISATION RECOMMAND E 8 INDICES UTILES 9 NETTOYAGE ET ENTRETIEN 9 EXT RIEUR FOUR 9 PANNEAU DE COMMANDE 9 CONDUI...

Page 26: ...tible D gagement minimum de C t gauche 75 mm 3 po 0 mm 0 po D gagement minimum de C t droit 25 mm 1 po 51 mm 2 po D gagement minimum de Arri re 75 mm 3 po 51 mm 2 po Configurer Le four doit tre instal...

Page 27: ...ulons 3 8 16 x 3 4 fournis rondelle plate et rondelle de blocage Voir Fig 5 c l aide de l quipement de levage appropri abaisser le four de son arri re son dessous Levez l unit et placez sur le stand V...

Page 28: ...talliques sur le sol de la chambre de cuisson Assurez vous que les deux feuilles de rev tement de foyer m talliques couvrent la totalit du fond de la chambre b Selon le mod le trois ou cinq plaques d...

Page 29: ...install doit tre mis la terre lectriquement conform ment aux codes locaux et ou la derni re dition du Code national de l lectricit ANSI NFPA 70 aux tats Unis Code canadien de l lectricit CSAC22 2 au...

Page 30: ...l allumage initial le br leur pilote reste allum sans que le cadran du robinet de gaz ne soit enfonc Apr s 1 2 minutes la vanne s ouvre compl tement pour laisser le gaz circuler au de l de la soupape...

Page 31: ...une Si le br leur ne s allume pas v rifier s il y a un probl me avec l alimentation en gaz S il y a d autres appareils allum s au m me moment teignez les temporairement et v rifiez si le br leur s all...

Page 32: ...fromage et le go t de votre client notez et gardez Cuisson sur soles fait r f rence la cuisson de la Pizza directement sur la sole C est g n ralement un produit mince qui requiert une temp rature d au...

Page 33: ...sir un po lon qui se rapproche le plus de la hauteur de votre produit Les po lons et les crans de couleur fonc e transf rent mieux la chaleur que les po lons ou les crans en aluminium de couleur clair...

Page 34: ...dant la journ e de production et la transformera en cendres Ces cendres peuvent tre bross es le lendemain avant d allumer le four Les soles de cuisson devraient tre gratt s et bross s pendant la journ...

Page 35: ...r jusqu ce que la combinaison d sir e soit atteinte Cela aidera r duire la chaleur du haut Le dessous des tartes br le avant que les garnitures soient cuites Temp rature de plateau trop lev e surtout...

Page 36: ...FLOOR MODEL GAS DECK OVEN OPERATION MANUAL TABLE OF CONTENTS 12 Vue clat e Y600 Y800 VUES CLAT ES ET LISTES DES PI CES MOD LE DE PLANCHER GAZ FOUR SOLES OP RATION MANUELLE...

Page 37: ...FLOOR MODEL GAS DECK OVEN OPERATION MANUAL TABLE OF CONTENTS 13 Vue clat e Y600 Y800 Contr les Br leurs VUES CLAT ES ET LISTES DES PI CES MOD LE DE PLANCHER GAZ FOUR SOLES OP RATION MANUELLE...

Page 38: ...NSEMBLE DE 4 38 S1003Y 1 PIED 16 PO ENSEMBLE DE 4 39 S1119Y 1 PIED ROULETTE 16 PO ENSEMBLE DE 4 40 M1242P 1 CONTR LE ASSY Y600 41 N5014A 1 MAMELON 1 2 PO X 5 PO TUYAU NOIR 42 N3021A 2 R DUCTION COUDE...

Page 39: ...ETTE 30 PO ENSEMBLE DE 4 38 S1003Y 1 PIED 16 PO ENSEMBLE DE 4 39 S1119Y 1 PIED ROULETTE 16 PO ENSEMBLE DE 4 40 M1242P 1 CONTR LE ASSY Y600 41 N5014A 1 MAMELON 1 2 PO X 5 PO TUYAU NOIR 42 N3021A 2 R DU...

Page 40: ...MOSTAT GAZ FD TH OU FD TO POUR OPTIONS CE SCH MA DE C BLAGE REMPLACE U6012Q D MARREUR DE FOUR AUTOMATIQUE OPTIONNEL 4 5 6 REG CONNEXIONS 1 2 3 CAPTEUR RTD CAPTEUR RTD DIG TEMP CONTR S RIES FENWAL 59 D...

Page 41: ...et Vannes sont couverts pour une p riode de SIX MOIS Toutes les soles de cuisson en c ramique sont garanties pour une p riode de TROIS MOIS L installation de ces soles de remplacement est la responsa...

Page 42: ...TURE Veuillez compl ter ces informations et conserver ce manuel pendant toute la dur e de vie de l quipement Pour le service de garantie et ou les pi ces ces informations sont n cessaires Num ro de mo...

Page 43: ...NOTES...

Page 44: ...et d v nements sur les m dias sociaux 1307 route N Watters Suite 180 Allen Texas 75013 T l phone 800 527 2100 T l copieur 914 576 0605 bakerspride com 15 4 2019 Social icon Square Only use blue and o...

Reviews: