Template 56377 10-05-12
59340-91_59342-01_59310_59371_97_C 10-17-19
3
Manufactured under one or more of these patents. U.S. Patents: 5332944, 5361215, 5550753, 5559720, 5,883,459, 6253227, 6282370, 6590188, 6976052, 6965815, 7030343, 7,417,834 b2,
Canadian Patent: 2342614, Australian patent: 2373248 other patents both foreign and domestic applied for and pending. © Copyright 2009 Balboa Water Group.
Power Requirements:
Single Service
[3 wires (line, neutral, ground)]
230VAC, 50/60Hz*, 1þ, 16A, (Circuit Breaker rating = 20A max.)
Single Service
[3 wires (line, neutral, ground)]
230VAC, 50/60Hz*, 1þ, 32A, (Circuit Breaker rating = 40A max.)
2-out-of-3-Service
[4 wires (line 1, line 2, no line 3, neutral, ground)]
230VAC line-to-neutral**, 50/60Hz*, 2/3þ, 16A, (Circuit Breaker rating = 20A max each phase line.)
NOTE: 2-out-of-Service is simply 3-Service (single common) with one of the three lines unused. The third line could be used for a slave heater if desired, or left for a use not
related to the spa at all.
*BP systems automatically detect 50Hz vs 60Hz. However, power frequency (50Hz vs 60Hz) is just one of many differences between North American (UL) and CE power, and it is
because of these other differences that different BP systems must be used for UL vs CE territories. Also, there are a few countries that use CE power but 60 Hz (such as South
Korea) which need CE systems, and a few countries that use UL power but 50 Hz which need UL systems.
** 3-phase service measured line-to-line will read about 400V, but BP systems do not use it line-to-line.
IMPORTANT -
Service must include a neutral wire, with a line to neutral voltage of 230VAC.
Basic Functions Setup 1 - 7
HiPot Testing Note:
Disconnect slip terminal with green
wires from J6 prior to performing
HiPot test. Failure to disconnect may
cause a false failure of the test.
Reconnect terminal to J6 after
successful completion of HiPot test.