background image

Note:

A pressure relief kit is recommended on 

all Balcrank supply systems. The lack 

of installing this kit will void all product 

warranties if system fails because of 

thermal expansion.

Installation

Table/Wall Mounting:

The hose reel has been shipped ready for use 

when mounting to wall/table or mobile  appli-

cations unless specified otherwise.  If a Bare 

reel has been ordered, see installation of hose 

instructions and power spring adjustmen on 

the following pages.

1.  Select the mounting location.  Be sure the 

structure is secure and will not tip when reel is 

in operation.  Tables should be bolted to floor 

and wall should be part of building structure.

2.  Locate the mounting holes for drilling, 

using measurements on previous page.

3.  Fasten the base using bolts of a sufficient 

strength to prevent the reel from “shearing 

bolts” during operation when hose is pulled.

4.  Connect supply line to the inlet of hose 

reel.  (see figure 5).

5.  Install the hose stop and dispensing valve.  

Position the hose stop so the hose extends far 

enough for all operations.

Ceiling Mounting:

The hose reel has been shipped ready for use 

when mounting to wall/table or mobile  applica-

tions unless specified otherwise.  The outlet 

arm will need to be adjusted for ceiling mount-

ing.  (see figure 8)  The power spring tension 

will ned to be adjusted for the ceiling height of 

the building.  If If a Bare reel has been ordered, 

see installation of hose instructions and power 

spring adjustmen on the following pages.

1.  Select the mounting location.  If the ceil-

ing is very high, suspend a suitable support 

structure for the reels, so the soses will be long 

enough to reach service area.

2.  Locate the mounting holes for drilling, using 

measurements on previous page.

3.  Adjust the outlet arm position.  Before 

removing the roller ooutlet assembly and 

the top tie bracket, the power spring tension 

should be released and the uprights should 

be secured to prevent accidental separation.  

Once the outlet arm is positioned correctly 

retighten bolts 80 to 90 inch pounds.  

(Refer 

to illustrations on page 9 for further details on 

changing the outlet arm position).

4.  Fasten the base using bolts of a sufficient 

strength to prevent the reel from “shearing 

bolts” during operation when hose is pulled.

5.  Connect supply line to the inlet of hose reel.  

(see figure 5).

6.  Install the hose stop and dispensing valve.  

Position the hose stop so the hose extends far 

enough for all operations.

                                                                                                          

Be sure the mounting surface is strong enough 

to support the reels, the weight of the lubiricants, 

and the stress caused by hard pulls on the ser-

vice hoses.   See page 4 for dry weights of the 

hose reel assemblies.

CAUTION

!

6

Summary of Contents for Premium EV Series

Page 1: ...d this manual before installing operating or servicing this equipment OPERATION INSTALLATION MAINTENANCE AND REPAIR GUIDE Models 2310 014 PREMIUM DIESEL REELS EV SERIES EXTRA VOLUME TRANSFER 2310 015...

Page 2: ...thers 3 Open dispensing valve until pressure is relieved WARNING The spring is ALWAYS under great tension and could be propelled from the case with enough force to cause serious bodily injury CAUTION...

Page 3: ...mbers Type of Service Model No Hose Size Maximum Working Pressure Outlet Hose Inlet Hose Bare Reel Wetted Parts Diesel Fuel 2310 014 50 x 3 4 50 psi 8466 050 8466 002 2310 001 Steel plated Buna N Bron...

Page 4: ...me 82 lbs Figure 3 Hose Reel Dimensions 3 4 1 npt Diesel Reel inlet Product Description The Heavy Duty Premium EV SeriesTM diesel hose reel is designed for service where longer capacities and larger v...

Page 5: ...8 tubing x 3 8 tubing 6 1 Male Elbow 3 8 tubing x 1 4 npt 7 4 90 Deg Female Elbow 5 8 tubing x 1 2 npt 8 2 Union 5 8 tubing x 5 8 tubing 9 3 8 OD x 083 wall soft copper tubing 10 5 8 OD x 083 wall de...

Page 6: ...usted for ceiling mount ing see figure 8 The power spring tension will ned to be adjusted for the ceiling height of the building If If a Bare reel has been ordered see installation of hose instruction...

Page 7: ...ca tions Stop the reel where the hose swivel is accessible and where the stop pawl is securely latched 4 Before installing the hose secure spool from accidental rotation by placing a clamp on the spoo...

Page 8: ...ws 11 12 which hold the top tie bracket and outlet arm assembly to the uprights Reverse the position of the roller outlet assembly as shown in figure 10 and replace screws see figure 11 Do Not put so...

Page 9: ...he desired tension Never allow the reel to spin freely Doing so will cause the hose to spin out of control which could cause serious injury if hit by the hose WARNING Replacing the Swivel 1 Be sure th...

Page 10: ...the upright 15 is clear of the base 40 and the top tie bar 19 lift to remove the assembly NOTE Be sure that both bolts 24 and safety cotter pins 20 are still in place on each side of the case before...

Page 11: ...has engaged the spring center plates 26 13 Align upright assembly 15 with base 40 and top tie bar 19 Place bolts 11 12 back through the base and top tie bar and tighten to 100 110 inch pounds Inspect...

Page 12: ...off center NOTE Number with is a component of the stop pawl repair kit 811128 Figure 8 Stop Pawl Replacement NOTE If the assembly does not appear to be returning back to its neutral position the sprin...

Page 13: ...35 35 48 48 8 8 51 13...

Page 14: ...Parts Listing for Premium EV Diesel Reels 2310 xxx 2310 014 2310 015 2310 016 ITEM PART DESCRIPTION QTY 27 808967 Spacer Spring Center Plate 1 x x x x 28 809311 Support Plate 1 x x x x 29 808793 1 Ho...

Page 15: ...NOTES 15...

Page 16: ...nt Accessories User Price List Refer to the Balcrank web site www balcrank com for a copy Any equipment returned to Balcrank must have the Warranty Service Claim number WSC clearly marked on the outsi...

Reviews: