5
MN905
Installation Continued
9.
Install the Tool Tables. Each tool table has two mounting studs extending from the
bottom (location A in Figure 3).
a.
Position table so the studs are in the slotted holes of the rocker (location A in Figure
3).
b.
Install washers and nuts provided to secure the tool table to the rocker.
c.
Adjust table for about
1
/
16
″
clearance between the table and rim face of the grinding
wheel then tighten the nuts.
d.
Repeat steps “a” through “c” for the other tool table.
10. Install the Water Trays. Each tray has two mounting holes that slide onto two pins on its
rocker.
a.
Slide the water tray onto the mounting pins located below the tool table and
between the front and rear surfaces of the rocker.
b.
Be sure the tray is securely seated on the pins so you can see the ends of the pins
in the mounting holes.
c.
Repeat Steps a and b for the other tray.
Figure 3 Tool Table and Water Tray Locations
A
A
Coolant Pot
Flow control spigot
Tool Table
Water Tray
Water Tray
Tool Table