background image

2

POWER ON

1.Main Unit Installation

2.Sensor Installation

AC Hole

Step1, Peel off the protecting

mask of main unit.

Step 3, Remove the the insulation strip

Switch to CH1

Switch to CH2

Switch to CH3

Step 1, Switch the

channels in order

Step 2,Plug the AC Adaptor

to a powered outlet.

Step 2, Load the 2xAA batteries

in 3 minutes to ensure RF

signal received in time.

Reviews: