background image

3

Measure the length and width of your new board.  Determine the wall center line and height

off the floor that you want your new board to be located.  Hold your board up in position and

draw a line under the bottom of the board and parallel with the floor.   If your wall has studs,

 determine the  centerline of  the studs.  It is recommended that you tie into as many studs

as possible when mounting your board.                                          .

aring to Install

Preparing to Install Your New Glass Board

NOTE:  The proper installation of your board will require at least  two people.

Tools required:     Tape measure, chalkline, electric drill / screwdriver, drill and

 screwdriver bits, stud finder and level.                                 .

1.)

Illustration # 1

2.) Measure 1” up from your  line and draw a second parallel line.  You will need to drill 3/16”

diameter holes in the back leg of the Tray extrusion for your mounting Screws (D).  See

Detail #2A for location.  Follow the recommended hole locations, correct wall mount

anchors and correct predrill for your type wall from Page 2.  Attach Tray (P2) to the

wall using the correct mounting hardware for your type wall.                               .

Illustration # 2

1”

Bottom of

Board Line

P2

D

Detail #2A

Drill  3/16” diameter  screw

holes on this line

1”

Summary of Contents for 14805

Page 1: ...Balt 4 x 8 Framed Magnetic Gloss Black Glass Dry Erase Whiteboard Instruction Manual ...

Page 2: ...45678901234567890123456789012123456789012 1234567890123456789012345678901212345678901234567890123456789012123456789012 1234567890123456789012345678901212345678901234567890123456789012123456789012 1234567890123456789012345678901212345678901234567890123456789012123456789012 1234567890123456789012345678901212345678901234567890123456789012123456789012 12345678901234567890123456789012123456789012345678...

Page 3: ...Glass Board A L Clip C Plastic Anchor D CS Screw Part Drawing Description Qty E Drywall Anchor B Self Drilling Screw For Dry Wall 1 4 Predrill For Masonry Walls For Stud Walls 1 8 Predrill 1 4 Predrilll D E D D C A A A TYPE WALL 3 16 min 24 max Edge of Board Wall Mount Locations on Board ...

Page 4: ...tion of your board will require at least two people Tools required Tape measure chalkline electric drill screwdriver drill and screwdriver bits stud finder and level 1 Illustration 1 2 Measure 1 up from your line and draw a second parallel line You will need to drill 3 16 diameter holes in the back leg of the Tray extrusion for your mounting Screws D See Detail 2A for location Follow the recommend...

Page 5: ...lace Board P1 into the wall mounted Tray P2 board groove Mark a line along the top edge of the board Draw a line 1 down from the top line Install the L Clips A using the recommended mount spacing and the correct hardware for your type wall Top of Board Line 1 ...

Page 6: ... the Glass Board P1 back into the board groove in the Tray P2 Push the L Clips down and secure to the top of the board using Self Drilling Screws B as shown in illustration 6 6 Illustration 6 P1 A P2 B Trimmed Glass Board_03 31 16 WWW MYBINDING COM ...

Reviews: