background image

W W W . B A L T I M O R E A I R C O I L . E U

FURTHER ASSISTANCE & INFORMATION

Balticare

BAC has established a specialized independent total care company called Balticare. The BAC Balticare offering

involves all elements required to ensure a safe and efficient operation of your evaporative cooling products. From a

full range of risk assessment to selective water treatment, training, testing, record keeping and annual system

overview.
For more details, contact your local BAC representative for further information and specific assistance at

www.BaltimoreAircoil.eu

More information

REFERENCE LITERATURE

Eurovent 9-5 (6) Recommended Code of Practice to keep your Cooling System efficient and safe.

Eurovent/Cecomaf, 2002, 30p.

Guide des Bonnes Pratiques, Legionella et Tours Aéroréfrigérantes. Ministères de l'Emploi et de la Solidarité,

Ministère de l'Economie des Finances et de l'Industrie, Ministère de l'Environnement, Juin 2001, 54p.

Voorkom Legionellose. Minsterie van de Vlaamse Gemeenschap. December 2002, 77p.

Legionnaires' Disease. The Control of Legionella Bacteria in Water Systems. Health & Safety Commission.

2000, 62p.

Hygienische Anforderungen an raumlufttechnische Anlagen. VDI 6022.

INTERESTING WEB SITES

www.BaltimoreAircoil.eu

www.eurovent-certification.com

www.ewgli.org

www.ashrae.org

www.uniclima.org

www.aicvf.org

www.hse.gov.uk

ORIGINAL DOCUMENTATION

This manual is originally made in English. Translations are provided for your convenience. In the event of

discrepancies, the English original text shall prevail over the translation.

14

TSU-M

4

4 Further Assistance & Information

4 Further Assistance & Information

Summary of Contents for ICE CHILLER TSU-M Series

Page 1: ...TSU M ICE CHILLER Thermal Storage Unit for internal melt RIGGING AND INSTALLATION INSTRUCTIONS RTSU Mv04EN...

Page 2: ...Shutdown General condition X X Ice Chiller tank X X Ice Chiller water 1 Quality Level X X X X Ice thickness X X Coil X X Ice Logic Ice Quantity controller condition of sensor X X Refrigerant Glycol qu...

Page 3: ...otection 6 Safety precautions 6 Non walking surfaces 7 Modifications by others 7 Warranty 8 2 Rigging 9 General notes 9 Support requirements 9 Recommended rigging method for 3 2 m long units 10 Recomm...

Page 4: ...of a specific unit or section refer to the certified drawing Before final placement of the thermal storage unit remove the shipping skids as illustrated in below figures Removal of shipping skids Sid...

Page 5: ...dd substantially to the equipment s lifting weight Leveling The unit must be level for proper operation and ease of piping The unit MUST be installed on a concrete slap with a levelness or maximum slo...

Page 6: ...se contact your local BAC Balticare representative for recommended protection alternatives Safety precautions All electrical mechanical and rotating machinery constitutes a potential hazard particular...

Page 7: ...ON Failure to use designated lifting points can result in a dropped load causing severe injury death and or property damage Lifts must be performed by qualified riggers following BAC published Rigging...

Page 8: ...e event of any such defect BAC will repair or provide a replacement For more details please refer to the Limitation of Warranties applicable to and in effect at the time of the sale purchase of these...

Page 9: ...n If rollers are used they should be placed under the unit and must exceed the unit width When the unit is installed all metal parts created by drilling fastening self tapping screws grinding welding...

Page 10: ...ecommended rigging method for 3 2 m long units TSU L184M TSU 237M 1 Safety slings for extended lifts Recommended arrangement for rollers used for final positioning 1 4 Rollers required 2 each side 2 F...

Page 11: ...mm High units Low units TSU 476M TSU L370M 2400 TSU 594M TSU L462M 2980 TSU 761M TSU L592M 3600 Dimensions for 6 m long units System charging Coils are filled in the factory with nitrogen Release the...

Page 12: ...s circulated throughout the loop Operate the pump for 24 hours and then check the system pressure and glycol concentration 1 Standard in and outlet connections are threaded To avoid damage to insulati...

Page 13: ...tart up the following services which are described in detail in the Operating and Maintenance Manual see table Recommended maintenance and monitoring programme must be performed Proper start up proced...

Page 14: ...maf 2002 30p Guide des Bonnes Pratiques Legionella et Tours A ror frig rantes Minist res de l Emploi et de la Solidarit Minist re de l Economie des Finances et de l Industrie Minist re de l Environnem...

Page 15: ...W W W B A L T I M O R E A I R C O I L E U...

Page 16: ...L STORAGE EVAPORATIVE CONDENSERS HYBRID PRODUCTS PARTS SERVICES www BaltimoreAircoil eu info BaltimoreAircoil eu Please refer to our website for local contact details Industriepark Zone A B 2220 Heist...

Reviews: