2 Rigging
2 Rigging
W W W . B A L T I M O R E A I R C O I L . E U
9
RIGGING
General Notes
1. To simplify rigging and installation, units are shipped in one piece, so only one lift is required. It is important to
follow the guidelines listed below when rigging these units.
2. Lifting devices have been provided for short lifts and final positioning. The table "Approximate Shipping weights
& Dimensions" shows the location of the lifting devices for each tank size.
3. Lifting and transportation of the equipment by means of lift trucks is not permitted, as this may result in serious
damage of the tank bottom and the ice coils.
4. Spreader bars of the full width of the section must be used between the lifting cables to prevent damage to the
section.
5. For extended lifts or where hazards exist, it is recommended to use the lifting devices in conjunction with
safety slings placed under the unit.
Support Requirements
ON A LEVEL CONCRETE PAD
The unit should be continuously supported on a level concrete pad. After the unit is set into final position, the tank
bottom should be sealed airtight all around to prevent condensation formation (see figure). The sealer is shipped
loose with the unit, together with the air pump.
Unit continuously supported on a level concrete pad
1.
Seal around base of tank
TSU-C-D
2