51 / 139
0006080093_00709
SIPHON FEED SYSTEM WITH FEED FROM THE TOP OF THE TANK
SUCTION FEED SYSTEM
GRAVITY FEED SYSTEM
Dimension P = 3,5 m. (max.)
TABLE OF PIPELINE FOR COMIST 36
H - Height difference between minimum fuel tank level and pump axis.
L - Total length of pipeline, including vertical lenght. Subtract 0,5 mt.
for every elbow or gate valve.
N.B. Comply with existing regulations regarding appa-
ratus required in the pipeline system
1 Tank
Feeding pipe
3 Wire-net filter
4 Pump
5 Degasifier
6 Suction pipe
7 Return pipe
8 Automatic fuel interception
device at burner shut off
9 Non-return valve
Pump axis
1 Tank
3 Wire-net filter
4 Pump
6 Suction pipe
7 Return pipe
8 Automatic fuel interception
device at burner shut off
9 One-way valve
10 Bottom valve
Pump axis
Pump axis
1 Tank
3 Wire-net filter
4 Pump
6 Suction pipe
7 Return pipe
10 Bottom valve
H
Total lenght meters
meters Ø i = 10 mm Øi.= 1 mm
1
0
30
5
35
3
30
40
4
35
45
H
Total lenght meters
meters Ø i = 10 mm Øi.= 1 mm
1
0
30
5
35
3
30
40
4
35
45
H
Total lenght meters
meters Ø = 10mm Øi. 1 mm
0,5
15
7
1
1
3
1,5
9
19
7
15
,5
4
10
3
-
7
3,5
-
-
Summary of Contents for comist 36
Page 136: ...136 139 0006080093_200709...
Page 137: ...137 139 0006080093_200709...
Page 138: ...138 139 0006080093_200709...
Page 139: ...139 139 0006080093_200709...