APPLICATION OF BURNER TO BOILER
- Position insulating seal 3 on the sleeve, placing cord 2 between
the flange and the seal.
- slacken screws “6”, adjust the position of connection flange
“5” so that the combustion head penetrates the furnace up to
the length recommended by the generator manufacturer.
- Fasten the burner 4 to the boiler 1 by means of the stud bolts,
washers and the nuts provided 7.
Note:Competely seal the space between the tube unit of the
burner and the hole in the refractory panel using suitable ma-
terials to do so.
ASSEMBLING THE GAS TRAIN
There are different ways of assembling the valve train, 8, 8a and 9
as shown in the drawing. The burner is supplied with the gas train
connection facing downward. If you wish to invert the direction of
train entrance to allow the valve set to be assembled in configuration
9, follow the procedure described in the section entitled: “Preparation
for connection with train turned upward”.
Choose the most rational position for the set-up of the boiler room
and the position in which the gas pipe arrives.
Summary of Contents for TBG 45ME
Page 2: ......
Page 4: ......
Page 6: ......
Page 22: ......
Page 38: ......
Page 54: ......
Page 70: ......
Page 86: ......
Page 102: ......
Page 103: ...97 101 0006081368_200807 ...
Page 104: ...98 101 0006081368_200807 ...
Page 105: ...99 101 0006081368_200807 ...