000
29
34
67
0
8 / 36
0006081428_201406
ENGLISH
ASSEMBLING VENTILATING UNIT
•
Position the half-hinges on the burner scroll in line with those
on the combustion head assembly.
•
Insert the hinge pin 10 in the position considered most suitable.
•
Connect the starter cables to the corresponding electrodes, close
the hinge, fasten the burner by means of the four screws 11. (No.4)
COMPLETING BURNER SETUP
•
Remove the protective yellow caps from the couplings beneath
the combustion head near the solenoid valves.
•
Connect the 12 diesel fuel pipes provided with the burner to their
corresponding connectors, making sure they are properly sealed.
ASSEMBLING THE GAS TRAIN
There are different ways of assembling the valve train as shown
in drawing 0002936400
.
Choose the most rational position for the
set-up of the boiler room and the position in which the gas pipeline
arrives.
!
In case of very large valves, e.g. DN65 or
DN80, make sure there is sufficient support
to prevent excessive stress on the gas train
connector.
Rigid pipe fixing screw
Rigid pressure detection pipe in the combustion chamber
Pressure intake in the
combustion chamber
Cut flush with diffuser
Pressure transmission pipe in the combustion chamber
Summary of Contents for TBML 160 PN
Page 2: ......
Page 36: ...34 36 0006081428_201406 ITALIANO SCHEMA ELETTRICO ...
Page 38: ...36 36 0006081428_201406 ITALIANO ...
Page 72: ...34 36 0006081428_201406 ENGLISH ELECTRIC DIAGRAM ...
Page 74: ...36 36 0006081428_201406 ENGLISH ...
Page 75: ......