ENGLISH
11 / 44
0006160003_201510
BURNER CONNECTION TO THE BOILER
ASSEMBLING THE HEAD UNIT
•
Position insulating seal -13 on the sleeve, placing rope -2
between the flange and the seal.
• Adjust the connection flange -19 position loosening the screws
-6. The burner head must penetrate to the extent requested by
the generator manufacturer.
•
Fasten the burner -18 to the boiler -1 with the stud bolts, wa-
shers and nuts provided -7.
DANGER / CAUTION
Completely seal the gap between the burner sleeve and
the hole in the refractory material inside the boiler door with
suitable material.
ASSEMBLING THE GAS TRAIN
The EN 676 approved gas train is sold separately from the burner.
The gas train can be assembled in different ways: -8 and (8a).
1 13
2
25
18
6
7
0002937450
Summary of Contents for TBML 50MC
Page 2: ......
Page 43: ...ITALIANO 41 44 0006160003_201510 SCHEMI ELETTRICI ...
Page 44: ...ITALIANO 42 44 0006160003_201510 ...
Page 45: ...ITALIANO 43 44 0006160003_201510 ...
Page 87: ...ENGLISH 41 44 0006160003_201510 WIRING DIAGRAMS ...
Page 88: ...ENGLISH 42 44 0006160003_201510 ...
Page 89: ...ENGLISH 43 44 0006160003_201510 ...
Page 91: ......