TT-100 Welding Positioner
Bancroft Engineering, LLC
21550 Doral Road Waukesha, WI 53186
Phone: (262)786-1880
www.bancrofteng.com
V1.0
P
a
g
e
4
PACKING LIST
Confirm the supplied items
Before using this product, confirm all items ordered are included in the packaging. In the event an item is
missing, please contact Bancroft Engineering or the dealer where you purchased the product.
PRE-SHIP INSPECTION LIST
Checklist of pre-ship tests and inspections
Inspection
OK
Deficient Comments
Low Speed Confirmation
High Speed Confirmation
CW-OFF-CCW Switch Confirmation
1 Hour test run completed
Spindle nut torque confirmed after run-in
(13.2 ft-lbs)
Optional Foot pedal test completed
Inspector Initials
ITEM NAME
QUANTITY
REMARKS
Positioner Main Unit
1
Power Cable
1
Operating Instructions
1
This Manual
T-nuts & Studs
4
Optional
Chuck
1
Optional
Foot Switch
1
Optional
Digital Display
1
Optional