Preformed Clamps
Place clamp in desired position on object to be clamped.
Follow steps 5 and 6 on page 9.
Inspect buckle on completed clamp and tap down buckle shroud as shown below.
When applying clamps on soft, thick-walled hose, tension clamp then wait a full 30
seconds. Clamps may be retensioned by squeezing the actuator switch on the power
unit a second time prior to forming the lock and cutting the excess clamp tail. This allows
hose to “settle” under the band of the clamp. This hose material attribute is called Cold
Flow. Finally, complete clamp by tapping down the buckle shroud as described above.
Important:
Visually inspect lock formed in band as shown. If lock has slipped under the sheared surface of the
buckle, remove clamp and install a new one at reduced tension by lowering the drill clutch torque setting.
Front View
Completed Clamp
(Visually inspect lock)
Buckle Shroud
Lock sheared in center and
formed inside shroud
Side View
Completed Clamp
Tap down buckle
shroud to complete
clamp
Shear Surface
Section View
Good Clamp
Bad Clamp
Lock has slipped back
under sheared buckle