INSTALLATION INSTRUCTIONS
Page 3 of 15
58471 Fir Road, Mishawaka, IN 46544
Phone: (574) 259-7838 Fax: (574) 259-7939
www.bandbmolders.com
PLUMBING HARNESSES
1
1
HOT FIXTURES HARNESS
2
The
(Hot Fixtures)
line has two connections
marked with a
on back side of Nautilus
panel:
"HOT"
&
"HOT WATER LINE/OUT."
2
Items Needed for Harness:
•
(2) 90
° swivel fittings, (1) inline tee
•
½" Pex tubing lines: (1) 1½", (1) 73/4”
•
(4) ½" Oetiker clamps
FRESH WATER TANK "IN" HARNESS:
The
(Fresh Water Tank In)
line has two panel
connections marked with a
on back side of
Nautilus panel:
"TANK FILL (PUMP)"
&
"TANK
FILL (CITY)."
Items Needed for Harness:
•
(2) 90
° swivel fittings, (1) inline tee
•
½" Pex tubing lines (1) 1½", (1) 4 ¾”
•
(4) ½" Oetiker clamps
There are five different plumbing harnesses that are necessary on the Nautilus P1 Panel.
Summary of Contents for Nautilus P1
Page 1: ......