Revision 2 December 2013
The installer must select and use fasteners appropriate to the material into which they are being fixed. Refer to fastener
recommendations on page 4 and drawings S01E, S02E, S03E.
NOTE:
It is the installer’s responsibility to ensure that the fixing methods are sound.
1.4 FIXING REQUIREMENTS
1.5 TOOLS CHECKLIST
Tools required to install the door. You will also need assistance to help you lift the door up safely and carry out some other steps.
• a power drill & bits
• phillips head screwdriver
• a file
• a socket set
• a hacksaw
• spirit level
• 2 stepladders
• Stanley knife
• adhesive tape
• marking pen
• 450mm (18”) pipe wrench
• 400mm softwood chock
• water level (10mm diameter
clear tube by 6m long)
1.6 PARTS CHECKLIST
A
B
C
D
E
F
G
H
I
J
K
J
K
L
M
N
O
P
DON’T CUT THE PLASTIC
A. 1 - rolled, plastic wrapped door
B. 2 - “A” style brackets, left and right handed
C. 2 - door guides, left and right handed
(aluminium)
D. 2 - locking bars (steel)
1 small parts bag containing:
E. 1 - door handle and fixings to suit
F. 2 - metal stops
G. 1 - faceplate and lock assembly 2 - keys
H. 2 - locking bar retainer
I.
2 - locking bar covers
J. 2 - “U” bolts
K. 2 - axle/bracket saddles
L. 4 - 8mm nuts and washer for “U” bolts
M. 2 - counter sunk screws for handle
N. 2 - 7mm x 4mm mushroom head screws
O. 2 - 4mm x 6mm locking bar screws
P. 4 - washers
6
Series 1 Windrated Installation Instructions