Revision 2 December 2013
2.7 ATTACHING STOP
To attach metal stops to bottom rail of door.
a) Hook stop behind lip in rail, as shown.
b) Secure from underneath the rail with screws supplied.
You will need to trim the weatherseal flush with the end
of the bottom rail.
1
2
WOOD CHOCK
ROLL-A-GUIDE
RESTRICTED HEADROOM 35mm
SPACE
EVENLY
GUIDE
CLEARANCE
3mm
ROLL-A-GUIDE
200mm
DOOR
CURTAIN
BOTTOM RAIL
BOTTOM RAIL LIP
STOP
(a)
(a)
(b)
(c)
(e)
(d)
(b)
2.5 TENSION THE SPRINGS
FIRST PREPARE A SOFT WOOD CHOCK, ABOUT 400mm LONG.
THEN
- Ensure that bottom rail is at the 3 o’clock position as shown
in Step 2.4.
a) Ensure both “U” bolts are tightened, then -
1. Rotate the door 1½ turns in a forward direction to apply tension.
Do not let go as the springs are now tensioned. See arrow in Fig
(a).
2. Hold the door firmly,
NOW
cut the plastic wrap along the bottom
rail (taking care not to damage door surface or weatherseal).
b) Pull the curtain down slowly and carefully position the wooden
chock (or other appropriate stop) as shown in Fig (b). Take care
not to damage door surface.
The chock will help hold the door until the guides and stops are fitted.
1
2
WOOD CHOCK
ROLL-A-GUIDE
RESTRICTED HEADROOM 35mm
SPACE
EVENLY
GUIDE
CLEARANCE
3mm
ROLL-A-GUIDE
200mm
DOOR
CURTAIN
BOTTOM RAIL
BOTTOM RAIL LIP
STOP
(a)
(a)
(b)
(c)
(e)
(d)
(b)
1
2
WOOD CHOCK
ROLL-A-GUIDE
RESTRICTED HEADROOM 35mm
SPACE
EVENLY
GUIDE
CLEARANCE
3mm
ROLL-A-GUIDE
200mm
DOOR
CURTAIN
BOTTOM RAIL
BOTTOM RAIL LIP
STOP
(a)
(a)
(b)
(c)
(e)
(d)
(b)
2.6 NOTCHING BOTTOM RAIL
Cut out
9
Series 1 Windrated Installation Instructions