5
Smart Pro
installation instructions
4. Kit Contents
4
5
6
7
8
9
10
11
12
13
14
17
16
1
2
3
15
18
1.
1 x SDO drive unit
2.
1 x Wall mount transmitter
3.
2 x Transmitters
4.
1 x Bent arm door attachment
5.
1 x Straight arm door attachment
6.
1 x Wall bracket TS01
7.
1 x Door bracket Locator
8.
1 x Door bracket
9.
3 x Pin Snap SSP 8 ZNU 31080
10.
2 x Hex Head screw M8x25
11.
1 x Pin 0890
12.
2 x Clevis Pin 0829
13.
2 x Hex Serration flange nut M8
14.
4 x Hex flange screw ‘S’ M4 x 10
15.
1 x Battery kit
16.
1 x Wireless PE Beam Kit
PLUS
17.
2 x Track Bracket
18.
1 x Track
10.00°
min
MINIMUM HEAD
ROOM FOR
RAIL 57mm
DOOR
S HIGH
EST
POINT
3156mm*
3374mm
150mm
353mm
Rail no Extension Kit 3156mm
Rail + 1 Extension Kit 4146mm
Rail + 2 Extension Kits 4936mm
* Rail refers to 3160 rail
170mm
17
1
18
5
4
6
7
12
8
14
11
9
13
10
5. Position
Perforated
Angle
The Opener:
a. MUST BE installed in a dry position, protected from weather.
b. REQUIRES properly earthed 3 pin single phase power on the ceiling within an arms length of the opener.
c. Requires a MINIMUM HEADROOM of 57mm between the highest point of the door’s travel and the ceiling.
d. Use the diagram below as a reference when completing the installation.
12
9
9
16
Placed on both sides of door, with
the beam 100mm above floor level.