32 / 43
51806-001 en/2021-12
1
electronic GmbH & Co. KG • Heinrichstraße 3-4 • 12207 Berlin • Deutschland • info@bandelin.com
6.2
Maintenance by manufacturer or quali
fi
ed personnel
The ultrasonic bath must be serviced every 2 years by the manufacturer or quali
fi
ed
personnel. Full functionality and safety-relevant properties are checked during
maintenance. If maintenance is carried out by the manufacturer, this includes, in particular,
calibration of the performance parameters, replacement of replacement components, such
as hoses, as well as the safety checks.
Maintenance kit/Scope of delivery
Maintenance kit (order no. 350003100):
1 T-hose
connector
3 L-hose
connector
1 cooling water arch
1 insulating hose 12/9 mm, 2 m long (to be cut to length by the customer)
2 hose clamps
1 insulating hose 22/9 mm, 0.3 m long
35 cable ties
1 foil test frame FT 4
1 TICKOPUR TR 13.2 litres
1 TICKOMED 1.1 litres
Documents supplied:
• EC safety data sheet TR 13
• EC safety data sheet TICKOMED 1
• Product information TR 13
• Product information TICKOMED 1
Additional accessories in accordance with order.
Auxiliary material required
• supplied maintenance kit
• commercially-available aluminium foil
• cross-recessed
screwdriver
• disposable
gloves
• hose cutting pliers, or a knife
• side cutting nipper