1676-002 en/2022-05
17/52
Preparation for operation
/4
4 Preparation for operation
4.1 Installation site requirements
The installation location of the ultrasound bath must meet the fol-
lowing conditions:
• The installation surface must be horizontal, firm and dry.
• The load-bearing capacity must be sufficient for the ultrasound
bath with the sonication fluid. For weight and work content, see
chapter
• Adequate ventilation must be ensured. The air supply under the
bottom of the unit may not be obstructed. If a sound proof box
is used, it must also ensure sufficient ventilation.
• A water connection should be available nearby to fill the ultra-
sound bath. A basin must be available to drain or pour out the
sonication fluid.
4.2 Assembling the ball valve
Applies to ultrasound baths from RK 102 H.
Fit the supplied ball valve, the hose grommet and the hose as
described in the assembly instructions included with the ball valve.
4.3 Conduct a function test
Requirement
• The ultrasound bath has adapted to the climatic conditions at
the installation site for at least 2?°?hours.
Procedure
1. Make sure that the ultrasound bath is switched off. The turning
knob to set the ultrasound duration must be set to “0”. If pres-
ent, the turning knob to set the heating temperature must be
set to “°C”, or the toggle switch must be in the left position
("0").
2. Plug the power cord of the ultrasound bath into a socket with
earthing contact.