12 / 22
23536 GB/2017-03
1
electronic GmbH & Co. KG • Heinrichstraße 3-4 • 12207 Berlin • Deutschland • info@bandelin.com
2 Preparation
Carefully unpack the generator and accessories and inspect them for completeness
or possible transportation damage. If any damage or defects are found, these must be
immediately noti
fi
ed in writing to the transportation company and to the supplier.
Before operation, the generator should be allowed to stand for 2 hours at its operating
location so that it can adjust to the ambient conditions.
2.1
Scope of delivery
1 HF-Generator, see delivery note
1 Mains cable (NL 7)
1 manual
Additional accessories according to order – see delivery note
2.2
Installation / connection
• Place the generator on a
fi
rm, level and dry surface. In doing so,
- the maximum weight, depending on the housing size and number of power
modules, may be up to 4 kg.
- do not obstruct the air supply below and next to the generator (10 cm distance).
- guard against moisture and wetness - risk of electric shock.
• Install the generator in a dust-free and dry room.
• Installation in an enclosed structure is not permitted
2.2.1 HF connection for ultrasonic transducer
The HF connection from the transducer is inserted in the HF connection socket and
must be secured with the HF cable screw cap.
Note:
HF generators are adjusted/programmed for a speci
fi
c load and coded via their
connection. It must be ensured at all times that only the transducer supplied is
connected. See also the type plate.
,