Installation • Switching on for the first time
54
Automation Panel 9x3 User's Manual V1.00
4 Switching on for the first time
4.1 General information before switching on
Checklist
The following items must be checked before the device is put into operation for the first time:
•
Have the installation notes as specified in "Installation" on page 47 been observed?
•
Have the permitted environmental conditions been taken into consideration for the device?
•
If the power supply connected correctly and have the values been checked?
•
Is the ground cable connected correctly to the ground connection?
•
The device must be put into operation first before additional hardware is installed.
Caution!
Before the device is put into operation, it must first be acclimated to room temperature! It should not
be immediately subjected to thermal radiation.
If transported at low temperatures or if there are large temperature fluctuations, the device must not
be subjected to any type of moisture.
Requirements
The following requirements must be fulfilled before the device is switched on for the first time:
•
The ground cable is connected.
•
All connection cables are connected correctly.
•
A USB keyboard and USB mouse are connected (optional).
•
An Automation PC or Panel PC is connected (via DVI or SDL).
4.2 Switching on the Automation Panel
Procedure
1. Connect and switch on the voltage supply (e.g. power supply).
2. The device is operating.