1.

Do an excavation for the foundation plate, fix the anchors
to the plate by the furnished screws. (Fig 3).
NOTE: fix the plate to the concrete, keeping attention to
position at 65 mm from the gate (Fig 4).

2.

Place flexible pipes necessary for the passage of electrical
connection cables. Flexible pipes should exceed at least 3
cm from the hole on the plate. (fig 3).

3.

Cement in perfect plane the plate.

4.

Wait till the cement has dried up.

5.

Place the cables for the connection between accessories
and electrical feeding. (fig 2).

6.

Fix the motor on the foundation plate by his screws.

Pass throw the hole on the plate the cables for the electrical
connection.

Fig. 3

Fig. 5

Fig. 4

FIXING OF THE RAK

1.

Set the rack with screws TE 8 x 25 and spacing bars.
NOTE: it is suggestible to close the screws of the rack in
the upper part of the buttonhole. This position allows to
adjust the rack when the motor, in the time, will lower.

2.

Unlock the motor.

3.

Move manually the leaf in an opening position.

4.

Place the rack over the pinion in correspondence of the
first spacing bar.

5.

Fix the rack element to the leaf with a clip.

6.

Manually move the leaf in closing till the third spacing bar
of the rack and sold it.

7.

Sold definitively the 3 spacing bars on the gate.

8.

Bring near another rack element to last fixed, using a piece
of rack if 150mm, in order to put in phase the 2 elements.

9.

Manually move the leaf in closing till reaching the
correspondence with the pinion.

NOTE: Check that all the elements of the rack works with the
centre of the tooth’s of the pinion.

10. Sold the 3 spacing bars of the element. los tres

distanciadores del elemento.

11. In order to obtain the right slack between rack and pinon,

lower the gear of 1.5mm moving the screws of the
foundation plate. At the end of such regulation, close the
fixing screws.

Manually check that the gate is free to completely open and that the
movement of the leaf is regular and without frictions

INSTALLATION OF LIMIT SWITCHES

Summary of Contents for MC10

Page 1: ...ding 230 Vca 50 Hz 10 Protection Grade IP44 Power 650W 0 9HP Working temperature 20 C 70 C Max weight of the gate 2000 Kg Capacitor 25 uF 400 V Speed 9 m min Clutch Double disk Maximum torque 5 daN Th...

Page 2: ...tested and settled according to the current laws and also a suitable external independent disconnecting switch which has to be adjusted on the current charge Throughout the installation procedure the...

Page 3: ...the upper part of the buttonhole This position allows to adjust the rack when the motor in the time will lower 2 Unlock the motor 3 Move manually the leaf in an opening position 4 Place the rack over...

Page 4: ...wait until it s completely stopped don t let the children or the animal play in the proximity of the gate don t let the children use the remote controls or the other commands of the gate do a periodic...

Page 5: ...e 39 0422 857377 Fax 39 0422 857367 email proget proget beb com Ponte di Piave 15 02 2005 Officer In Charge GINO BASSI The description and the electrical plan of this instructions guide are not bindin...

Page 6: ...been observed the following rules EN 13241 1 Doors and industrial commercial and residential gates Product rule Products which are not resistant to the fire or without smoking control EN 12453 Porte...

Page 7: ...Location Address of the installation LIST OF INSTALLED COMPONENTS The technical features and the performances of the listed components below are described in the related manuals of installation and or...

Page 8: ...gulations Maintenance Repairing Modifies Notes Trimmer Dipswitch Jumper Date Technician s signature Client s signature Description of the intervention Tick the square according to the intervention don...

Reviews: