Contents
1.1 Important... Read This Before Proceeding!
1.2 Use of Warnings and Cautions
1.3 EU/UK Declaration of Conformity (DoC)
2.2 Applicable OSHA Regulations
2.3 International/European Standards
3.1 Appropriate Applications and Limitations
3.1.1 Appropriate Applications
3.1.2 Examples: Inappropriate Applications
3.1.3 Control Reliability: Redundancy and Self-Checking
3.3.2 External Device Monitoring (EDM)
5.1 Mechanical Installation Considerations
5.1.1 Calculating the Safety Distance (Minimum Distance)
5.1.3 Reducing or Eliminating Pass-Through Hazards
5.1.4 Supplemental Safeguarding
5.1.6 Adjacent Reflective Surfaces
5.1.8 Emitter and Receiver Orientation
5.1.9 Installation of Multiple Systems
5.2 Mounting System Components
5.2.2 Mounting the End-Mount Brackets
5.2.3 Mounting the Center- and Side-Mount Brackets
5.2.4 EZLSA-MBK-16 Side-Mount Bracket
5.2.5 Sensor Mounting and Mechanical Alignment
6 Electrical Installation and Testing
6.2 Initial Electrical Connections
6.3 Initial Checkout Procedure
6.3.1 Configuring the System for Initial Checkout
6.3.4 Optical Alignment Procedure with Mirrors
6.4 Electrical Connections to the Guarded Machine
6.4.2 FSD Interfacing Connections
6.4.3 Machine Primary Control Elements and EDM Input
6.4.4 External Device Monitoring
6.4.7 Preparing for System Operation
EZ-SCREEN
®
LS Basic Safety Light Curtain