background image

P a g e

 | 

(A) 0414  

Assembly  

Most of the unit is assembled from the factory with the exception of the upper handle. 

To install the handle please follow the steps below and also refer to the parts diagram 

on page 3 for clarification. 

 

1.

 

Remove the plastic wrap which covers the top portion of the hopper. 

2.

 

On the lower handle remove the nuts, bolts and washers. 

3.

 

Remove the upper handle from its plastic wrap. 

4.

 

Line the (lower) holes on the upper handle with the (lower) holes on the lower 

handle and be sure that the upper handle is to the outside of the lower handle. 

5.

 

Insert the bolts (washer under the head) along with the nuts (washer under the 

nut) on each end, but do not tighten. 

 

At this point, note the slot on the top of the lower handle. This allows the handle to be 

adjusted for various operators’ height.  

 

6.

 

Insert the next set of bolts and nuts, but do not tighten.  

7.

 

Raise/lower the handle until a comfortable position is achieved and then tighten 

the top set of bolts. The help of another person may be required. 

8.

 

Last, tighten the lower holes and proceed to Setup & Operating Procedure. 

 

Setup & Operating Procedure 

All Mini Toppers are setup, from the factory, in a default position. Do not use the Mini 

Topper straight from the box without following the proper setup instructions below. The 

best place to perform this procedure is on either hard or paved surfaces.  

 

1.

 

Place the material intended to be used in the hopper until the level just passes 

the bolts which mount the front and rear brushes (about 4-5 inches off the 

drum). 

2.

 

Push the Mini Topper forward for about 10-20 feet or until the material runs out. 

3.

 

Measure the thickness of the material. 

 

A general rule of thumb for top dressing is to apply approximately ¼” thickness of 

material.  

 

At this point, if the material is  too  difficult  to  spread  or does not spread well, the 

moisture content is too high. To lower the moisture content spread the material out on 

a tarp and repeat steps 1-3 the next day. To quickly reduce the moisture content, mix 

the material with sand. Start off with sand to material ratio of 1:4 (25%) and increase 

from there if this is not sufficient.  

 

 

Reviews: