27
5. Routine check before daily operation
(1) Check the storage of fuel.
(2) Check if any leak or damage found on the oil pipe, water hose, vent-pipe and
hydraulic parts.
(3) Check whether the hydraulic hose storage attain to the regular capacity, the oil
level should be at the middle position between the upper and lower scale marks of oil
level meter.
(4) Check if fix or loose found on the wheel bolt and transmission bolt.
(5) Check tires air pressure.
(6) Check steering and transmission for flexibility and reliability.
(7) Check the traveling brakes: The free travel of brake pedal is 40mm, the
clearance between the front floor and the pedal should be bigger than 20mm.
(8) Check the parking brake: The unload truck can park on the 20% grade ramp,
when the parking level is pulled to the bottom.
(9) Check the electric system to see whether connect, the connector whether loose,
the lights, meter whether work normally.
6. Precautions of cooling system
(1) Use extreme care when removing the radiator pressure cap. In pressure system,
the sudden release of pressure can cause a steam flash which would cause a serious
personal injury. Loosen cap slowly to allow steam to escape. After that, tighten cap
securely.
(2) Check the radiator coolant reservoir fluid level. It should between FULL and
LOW mark. Add the same type coolant to specified level if necessary. The coolant can
be used all the year round.
(3)
Put the coolant on a safe place and mark “Dangerous Matter” for its poisonous.
If swallowed by accident, take the emergency first aid and consult a physician
immediately.
(4) According to variety working condition, periodic wiping away the dirt adhering to
the surface of the radiator is necessary.
7. Notes during brake-in
Operating the machine under the light load, low speed condition for the first stage
of operation of 100 hours. Avoid suddenly speeding and brake. Renew the oil in engine
oil pan, transmission, driving axle and hydraulic oil tank after 200 operation hours.
Summary of Contents for CPCD 100
Page 1: ...Original instructions ...
Page 25: ...19 4 Lubrication system 5 Capacity chart 6 Inspections before starting ...
Page 32: ...26 Lubrication diagram ...
Page 50: ...44 Fig 2 4 Forward shift clutch Fig 2 5 Reverse shift clutch Fig 2 6 Control valve ...
Page 61: ...55 Fig 4 2 Position of brake pedal ...
Page 99: ...93 Fig 9 1 Principle diagram of electric system domestic CPCD80 100CY ...
Page 100: ...94 Fig 9 2 Principle diagram of electric system imported CPCD80 100W ...
Page 104: ...98 Fig9 5 1 Diagram of meter harness domestic CPCD80 100CY ...
Page 105: ...99 Fig9 5 2 Diagram of meter harness imported CPCD80 100W ...
Page 106: ...100 Fig9 5 3 Diagram of main harness domestic CPCD80 100CY ...
Page 107: ...101 Fig9 5 4 Diagram of main harness imported CPCD80 100W ...
Page 109: ...103 NOTE ...
Page 110: ...104 ...
Page 112: ...106 incurring any obligation ...