33
1.5 Coolant system
The coolant system composed with water pump, fan, radiator and the ancillary
radiator, the water pump installed in the engine, the crank through the V-series tape to
drive the water pump work.
1.6 Check and adjustment
To have a good work state, it needs to check and research on the engine termly.
The main point is as following:
1.6.1 Cleaning of the air condition (Fig.1.6)
(1) Take out the filter.
(2) Check the dust and the damage of the filter, fist puff away from inside to outside
to clean with low pressure air
, if it’s jammed and can’t clean or has been damage,
change a new one.
(3) Clean the dust in the cover.
Fig.1.6 Air condition
1.6.2 Replacement of fuel filter (Fig.1.7)
(1) Use the filter specially spanner disassemble, if damage or
block, need to change.
(2) Along with the around of the new filter seal O-ring, add little
lube then install, when it contact the filter, screw 2/3 circle.
Fig.1.7
Summary of Contents for CPCD 100
Page 1: ...Original instructions ...
Page 25: ...19 4 Lubrication system 5 Capacity chart 6 Inspections before starting ...
Page 32: ...26 Lubrication diagram ...
Page 50: ...44 Fig 2 4 Forward shift clutch Fig 2 5 Reverse shift clutch Fig 2 6 Control valve ...
Page 61: ...55 Fig 4 2 Position of brake pedal ...
Page 99: ...93 Fig 9 1 Principle diagram of electric system domestic CPCD80 100CY ...
Page 100: ...94 Fig 9 2 Principle diagram of electric system imported CPCD80 100W ...
Page 104: ...98 Fig9 5 1 Diagram of meter harness domestic CPCD80 100CY ...
Page 105: ...99 Fig9 5 2 Diagram of meter harness imported CPCD80 100W ...
Page 106: ...100 Fig9 5 3 Diagram of main harness domestic CPCD80 100CY ...
Page 107: ...101 Fig9 5 4 Diagram of main harness imported CPCD80 100W ...
Page 109: ...103 NOTE ...
Page 110: ...104 ...
Page 112: ...106 incurring any obligation ...