64
4.6.3 Meter connector
Port No.
Function
Color
A1
Input power 12V
Red
A2
Dual switch shift
Ⅰ
(width indication)
Purple
A3
Dual switch shift
Ⅱ
(head lamp)
Orange
A4
Hand brake signal(48V)
Blue
A5
Forward signal
Brown
A6
Backward signal
Gray
A7
Input left turning signal
Yellow
A8
Input right turning signal
Green
A10
Input short signal
Pink
B1
12V(key switch)
Grown
B2
Output 12V(key switch)
Red
B3
Input 48V (Input 80V)
Yellow and green
B4
Output 48V(Output 80V)
Purple
B5
Power negative
Black
B6
Voltage measuring(pump output)
Light blue
B7
Backing buzzer output (12V)
Green
Summary of Contents for CPD10
Page 1: ......
Page 6: ...1 Ⅰ External view and specification External view of electric forklift truck ...
Page 26: ...21 2 General information when operating 3 Nameplate of forklift truck 4 Lubrication system ...
Page 27: ...22 5 Capacity chart 6 Inspections before starting 7 Adjust parking brake 8 Add hydraulic oil ...
Page 33: ...28 Fig 1 2 Gear box and differential 2 3t ...
Page 34: ...29 Fig 1 3 Differential ...
Page 57: ...52 Fig 4 2 Principle of electric system DC CPD10 25 ...
Page 58: ...53 Fig 4 3 Principle of electric system DC CPD30 ...
Page 60: ...55 Fig 4 5 Principle of electric system AC ...
Page 77: ...72 4 8 Harness Fig 4 10 Harness DC CPD10 30 ...
Page 78: ...73 Fig 4 11 Harness AC CPD10J 15J ...
Page 79: ...74 Fig 4 12 Harness AC CPD20J 30J ...
Page 81: ...76 Fig 5 1 Assembly diagram of lifting motor Fig5 2 Lifting motor ...
Page 101: ...96 3 Hydraulic oil circuit ...
Page 115: ...110 Fig 8 2 Inner and outer mast 2 3t ...
Page 124: ......