Figure 14 shows the minimum thickness of the insulation plates and the minimum
clearances to a non-flammable ceiling
Make sure the total area of the convection air outlet opening is minimum 440 cm
2
.
1
Chimney enclosure
2
Convection air outlet opening
3
Non-Flammable ceiling
4
Insulation plate (false ceiling)
5
Insulation plates
Figure 14. Clearances to non-flammable ceiling - Front view
Table 7: Minimum dimension and clearance to non-flammable ceiling
With false ceiling, mini-
mum 25 mm thickness
Without false ceiling
h
Area of the convection air
outlet opening
Minimum 440 cm
2
Minimum 20 cm open space
between ceiling and chim-
ney enclosure
H
Height of the false ceiling
Minimum 25 mm (= thick-
ness false ceiling)
Not applicable (the top side
of the chimney enclosure is
open with a clearance of
minimum 20 cm to the ceil-
ing.
A
Distance between convec-
tion air outlet opening and
ceiling
Minimum 13 cm
Minimum 20 cm open space
between ceiling and chim-
ney enclosure
Clearances
26
Gas Fire Front 90-75
Summary of Contents for 90-75 PF2
Page 60: ...3 Slide the strip downwards 4 Tighten the nut wings Maintenance 60 Gas Fire Front 90 75...
Page 78: ...9 9 BARBAS Airbox 160 with 4 insert models Dimensions 78 Gas Fire Front 90 75...
Page 79: ...9 10 BARBAS Airbox 320 with 4 insert models Dimensions Gas Fire Front 90 75 79...
Page 82: ...11 EU Declaration of Conformity EU Declaration of Conformity 82 Gas Fire Front 90 75...
Page 83: ...EU Declaration of Conformity Gas Fire Front 90 75 83...
Page 84: ...Your Barbas dealer 002 21 07 2022 352044 242 002...