18
BOX 45
Installation instructions
4
OPERATION
Figure 1: Operation Box
1 Handle
2 Ceramic heat-proof glass
3 Grate
4 Ashtray
5 Combustion air-supply slider (Combined operation for the primary, secondary and
tertiary combustion air-supply)
6 Inlet opening (2x) combustion air from living-room, if a direct outside air supply is not
connected. This will be determined when the appliance is installed.
Do not EVER close open inlet openings.
7 External connection combustion air supply (not pictured: possible at the bottom)