19
BOX 75
Installation instructions
Figure 2: Operation Box with wood log store module
1 Handle
2 Ceramic heat-proof glass
3 Grate
4 Ashtray
5 Combustion air-supply slider (Combined operation for the primary, secondary and
tertiary combustion air-supply)
6 Inlet opening (2x) combustion air from living-room, if a direct outside air supply is not
connected. This will be determined when the appliance is installed.
Do not EVER close open inlet openings.
7 External connection combustion air supply (not pictured: possible at the bottom)
Summary of Contents for BOX 75
Page 2: ......
Page 6: ...6 BOX 75 Installation instructions...
Page 28: ...28 BOX 75 Installation instructions 7 DIMENSIONS 7 1 BOX 75...
Page 29: ...29 BOX 75 Installation instructions 7 2 BOX 75 WITH WOOD LOG STORAGE MODULE...
Page 33: ...33 BOX 75 Installation instructions...
Page 34: ...34 BOX 75 Installation instructions...
Page 35: ......