5. Physical installation top cooler
Necessary parts
•
Cooler housing already assembled.
•
4x M5 x 10
•
1x M4 x 8
How to mount
1. Place the frame assembly on the projector as indicated. Make sure that the holes of both feet (ref 1) of the projector matches
the holes of the cooler housing.
1
2
Image 5-15
2. Drive in both screws M5 (ref 1) on each side.
3. Drive in the last
fi
xation screw M4 (ref 2).
5.5
Insert the cooler units
Necessary tools
Flat screwdriver
Before you start
Check if the two indicated screws (reference 1) are present. If it is the case, remove this screws.
The use of these screws may become necessary to
fi
xate the cooler in the cooler assembly when the captive screws (reference 2)
does not work.
46
R5906753 DPXK BLP SERIES 20/11/2017
Summary of Contents for DP2K-17BLP
Page 4: ......
Page 8: ...Table of contents 4 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 30: ...3 Installation process 26 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 40: ...4 Physical installation projector 36 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 120: ...10 Communicator Touch Panel Image 10 7 Connections 116 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 152: ...14 Maintenance 148 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 162: ...16 Color calibration 158 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 176: ...18 Specifications 172 R5906753 DPXK BLP SERIES 20 11 2017 ...