13. Preventative maintenance actions
13.2 3 month maintenance actions
MAINTENANCE TYPE B (perform every three months)
The 3 month maintenance actions, listed below, may be performed by a trained projectionist who is familiar
with potential hazards associated with the product.
No.
Maintenance action
Remarks
1
Clean the back/side air inlet vents of the Light Source.
Use a vacuum cleaner.
2
Clean the housing of your projector.
Removal overall dust accumulation
on projector covers. See cleaning
instructions in this manual.
3
Verify the internal clock of the ICMP with real time clock. Correct if needed.
ICMP version 1.2.1 is required.
Communicator version 5.0 is required.
See user guide of Communicator for
detailed instructions.
R5906847 DP2K SLP SERIES 02/06/2017
119
Summary of Contents for DP2K SLP Series
Page 1: ...DP2K SLP Series User and Installation manual R5906847 00 02 06 2017 ...
Page 4: ......
Page 15: ...1 Safety PR RESTRICTED AREA RESTRICTED AREA Image 1 2 R5906847 DP2K SLP SERIES 02 06 2017 11 ...
Page 18: ...1 Safety 14 R5906847 DP2K SLP SERIES 02 06 2017 ...
Page 44: ...5 Lenses Lens selection 40 R5906847 DP2K SLP SERIES 02 06 2017 ...
Page 86: ...7 ICMP 82 R5906847 DP2K SLP SERIES 02 06 2017 ...
Page 96: ...9 Starting up 92 R5906847 DP2K SLP SERIES 02 06 2017 ...
Page 108: ...10 Scheimpflug 104 R5906847 DP2K SLP SERIES 02 06 2017 ...
Page 116: ...11 Convergence 112 R5906847 DP2K SLP SERIES 02 06 2017 ...
Page 124: ...13 Preventative maintenance actions 120 R5906847 DP2K SLP SERIES 02 06 2017 ...
Page 162: ...B Pin configurations 158 R5906847 DP2K SLP SERIES 02 06 2017 ...
Page 172: ...C Environmental information 168 R5906847 DP2K SLP SERIES 02 06 2017 ...