3. General
3.8
E2 Rack-Mount Procedure
General
The E2 chassis is designed to be rack mounted and is supplied with front rackmount hardware. Please note the following important
points:
•
The E2 is 4RU in height.
•
The maximum ambient operating temperature is 40 degrees C.
•
Leave suf
fi
cient front and rear space to ensure that air
fl
ow through the E2 is not restricted.
•
When installing equipment into a rack, distribute the units evenly to prevent hazardous conditions that may be created by uneven
weight distribution.
•
Connect the E2 only to a properly rated supply circuit.
•
Reliable grounding (earthing) of rack-mounted equipment should be maintained.
•
Rack mount the E2 from the front rack ears using four rack screws (not supplied). Threads may be metric or otherwise, de-
pending upon the rack type.
C
AUTION
:
At a minimum, an E2 chassis weighs 31 kg (68 lbs). To avoid injury, it is recommended that two
people rack mount the chassis.
How to install E2 in a rack
Use the following steps to rack mount the E2:
1. The E2 is shipped with side rails included in the shipping case and not installed onto the chassis. These side rails, when they
are properly installed and adjusted, assist with the distribution of chassis (and cable) weight within your rack. Use the following
steps to properly adjust the side rails:
R5905948 E2 12/12/2014
25
Summary of Contents for Event Master E2
Page 1: ...E2 User s guide R5905948 00 12 12 2014...
Page 8: ...Table of contents 4 R5905948 E2 12 12 2014...
Page 16: ...2 Safety 12 R5905948 E2 12 12 2014...
Page 32: ...3 General 28 R5905948 E2 12 12 2014...
Page 82: ...6 GUI orientation Image 6 8 78 R5905948 E2 12 12 2014...
Page 94: ...6 GUI orientation Image 6 20 90 R5905948 E2 12 12 2014...
Page 115: ...6 GUI orientation Image 6 37 Thumbnail view Image 6 38 R5905948 E2 12 12 2014 111...
Page 186: ...7 System Setup 182 R5905948 E2 12 12 2014...
Page 192: ...8 Updating firmware 188 R5905948 E2 12 12 2014...
Page 196: ...9 General operation example Image 9 3 192 R5905948 E2 12 12 2014...
Page 213: ...9 General operation example Image 9 25 R5905948 E2 12 12 2014 209...
Page 216: ...9 General operation example 212 R5905948 E2 12 12 2014...
Page 220: ...10 Maintenance 10 2 Process Overview Flow chart Image 10 2 216 R5905948 E2 12 12 2014...
Page 281: ...10 Maintenance Disregard the heatsink from the spare kit R5905948 E2 12 12 2014 277...
Page 282: ...10 Maintenance 278 R5905948 E2 12 12 2014...
Page 288: ...11 Environmental information 284 R5905948 E2 12 12 2014...
Page 298: ...B Remote Control Protocol 294 R5905948 E2 12 12 2014...
Page 299: ...C Troubleshooting C TROUBLESHOOTING R5905948 E2 12 12 2014 295...
Page 300: ...C Troubleshooting 296 R5905948 E2 12 12 2014...