18
4. Once the securing brackets have been fastened to the top of the infill panel, fix the
remaining bracket to the rear lower LHS of the infill using two of the M6 bolts supplied and
manoeuvre it into place next to the cabinet, as shown in the image below.
5. Each Infill panel has two cables attached, feed the grey power cable into the first machine
and connect into one of the spare sockets available on the Barbus distribution PCB
interface, as shown in the image below. The second braided sync cable is now fed into the
second machine and is connected into one of the spare sockets available on the Barbus
distribution PCB interface and so on for each infill panel ensuring that only one grey power
cable is fitted to each Barbus interface PCB.
Fasten the earth tag to the cabinet any loose infill wiring should then be fitted into the
existing harness retaining clips.
6. The second Triple 7 cabinet can now be manoeuvred next to the infill unit. Once aligned the
infill unit can be fastened to the cabinets by using the remaining four M6 bolts as shown in
the image below.
7. Reconnect the mains supply to ensure the unit is functioning correctly.