PRE-POWER CHECKLIST
Have you thoroughly examined the case for shipping damage? (see pg. 5)
Have you checked the vertical plumb of the case? The horizontal level?
(see pg. 6)
Have you applied the sealant to the end breakers of adjoining cases?
(see pg. 7)
Have you sealed the case-to-case joints by applying caulk and acrylic tape to
the end frame seam? (see pg. 7)
Have you installed the toekick? (see pg. 7)
Have you removed the shipping blocks from the refrigeration and plumbing
lines? (see pg.10)
After powering-up the case, be certain that all of the steps listed below have
been completed to ensure proper case functionality, safety and compliance with
warranty terms.
1.
Check all lights to ensure they are all functioning properly.
2.
Check case temperature and adjust controller as needed.
Before powering-up the case, be certain that all of the steps listed below have
been completed to ensure proper case functionality, safety and compliance with
warranty terms.
15
Summary of Contents for GMD-R
Page 2: ...ii...