background image

11

Section C – Chimney Surround & Roof

1. Centre the recess panel on the     

    mantle and lay out the first layer of 

    the wall surround. Quarry stone sits in 

    recess panel notch in all 5 layers.    

    Adjust as needed. Glue this layer 

    down using the included landscape 

    glue, except for the recess panel in 

    case you want an access point to the 

    chimney.

 

 

8 x 12  (4) 

4 x 8   (4)

 

8 x 8  (3) 

4 x 4   (2)

 

IMPORTANT:

 

Periodic checks must 

be made to ensure that the layers          

remain  level.  If  layers  are  not  level,  use  the         
included shims to adjust as necessary.

2. Lay out the second layer of the wall 

    surround as indicated in the diagram. 

 

 

8 x 12  

(6)

 

8 x 8  

(2)

 

4 x 4  

(2)

3. Repeat the patterns from Steps 

    1&2 to a height of 5 layers above 

    the mantle, checking the layers 

    remain level. Glue the 5th layer down 

    using the included landscape glue.

IMPORTANT:

 

Allow glue to set for at 

least 

2 hours 

before installing the roof.

Check to ensure the glue has begun to 

set so that the roof does not move any 

blocks underneath. Blocks should be 

steady when moved.

Match distance from 

back edge with 

quarry stone beneath 

the mantle.

4”x4”

8”x12”

8”x8”

8”x12”

8”x8”

4”x4”

4”x8”

Summary of Contents for oasis

Page 1: ...oasis fireplace stone oasis collection assembly operation and maintenance guide Note The Fireplace Kit shown is the 2014 model which includes the upgraded chimney design...

Page 2: ...or maintenance can cause injury or property damage Read the installation instructions thoroughly before installing the fireplace 2 DO NOT TOUCH AREAS IF FIRE IS BURNING SEVERE BURNING MAY RESULT CLOTH...

Page 3: ...ghter fluid gasoline kerosene or similar liquids TO START OR MAINTAIN A FIRE PROXIMITY TO BUILDINGS AND OTHER COMBUSTIBLE MATERIALS 1 The consumer is responsible for reviewing the local regulations pe...

Page 4: ...te If installing your oasis fireplace on an unstructured base please ensure to follow these steps Excavate area approx 9 below grade Excavate approx 6 larger than your actual kit dimensions to ensure...

Page 5: ...5 arch back mantle large chimney bottom and top firebox hood firebox front mantle small recess panel roof plastic and steel shims fireplace cap 2 pieces 12 x 3 1 8 quarry stone...

Page 6: ...PORTANT Periodic checks must be made to ensure that the layers remain level If layers are not level use the included shims to adjust as necessary 2 Lay out the second layer directly on top of the firs...

Page 7: ...ry stone behind and below using the included landscape glue 8 x 12 accent stone 13 5 Lay out the fourth layer of the wall surround as indicated in the diagram Glue this layer down using the included l...

Page 8: ...st be made to ensure that the layers remain level If layers are not level use the included shims to adjust as necessary 2 Lay out the second layer of the wall surround as indicated in the diagram Glue...

Page 9: ...er of the wall surround as indicated in the diagram 8 x 12 9 5 Place the arch into the seventh layer as indicated in the diagram Glue the arch down where it contacts the quarry stone below using the i...

Page 10: ...nd as indicated in the diagram 8 x 12 8 4 x 8 3 4 x 5 1 8 2 8 x 4 1 8 2 12 x 3 1 8 1 7 Lay out the eighth layer of the wall surround as indicated in the diagram Glue this layer down using the included...

Page 11: ...yers are not level use the included shims to adjust as necessary 2 Lay out the second layer of the wall surround as indicated in the diagram 8 x 12 6 8 x 8 2 4 x 4 2 3 Repeat the patterns from Steps 1...

Page 12: ...Place the chimney on top of the firebox hood as indicated Apply a generous amount of high temperature silicone on the underside of the duct flange see close up picture on right Insert ducting into fir...

Page 13: ...a height of 5 layers above the roof checking the layers remain level Glue the 5th layer down with landscape glue 9 Install the two piece fireplace cap as indicated in the diagram Adjust the cap as ne...

Page 14: ...cks may appear in the firebox or firebox hood This is normal and will not affect the quality of your fireplace OPERATING INSTRUCTIONS Your fireplace is designed to be used with natural dry wood produc...

Page 15: ...etal container with a tight fitting lid This container should be stored on a non combustible surface away from fire hazards Ensure ashes are completely cold before disposing of them appropriately 2 Us...

Page 16: ...nipeg Office 909 Gateway Road Winnipeg MB R2K 3L1 T 204 667 3310 or 1 800 342 2879 F 204 663 4854 winnipeg barkmanconcrete com Stone Oasis Circle Patio and Border Stone Oasis Rectangular Patio and Bor...

Reviews: