Lindsay Transportation Solutions Sales and Services, Inc
(888) 800-3691 [U.S. toll free] or +1 (707) 374-6800
9
X-Tension - Tangent Installation Instructions
At
Post 7
At
Post 5
At
Post 3
At
Post 1
Step 1 - Set Out
The tangent terminal is essentially an 11.4m (38 ft) continuation of the standard guardrail run.
Pull a string line out with the desired offset (0 -450mm : 0-1.5 ft) over the length of the system, in
a straight flare (Figure 1).
The system should not be installed on parabolic curve
. The string
line should be set to follow the roadside edge of the posts.
All the posts except post #1 have a blockout so take care to place the roadside face of
post #1 200mm (8 in) towards the roadway to compensate for the lack of blockout.
X-TENSION
®
SYSTEM