background image

IP56_Installation Procedure - Telescopic Boom Gate   ©  Copyright 2019   

www.barriergroup.com.au

STEP 3:

 

Adjust boom length to suit desired opening. Secure the length using the 
thumb screw. Attention: Do not over-tighten! Test gate operation.

Important information.

Read carefully. 

Keep this information for further reference. 

WARNING

The gate will not provide optimum performance unless it is installed correctly. For 

satisfactory gate operation please follow the instructions carefully. 

NOTE:

 No guarantee will be given or responsibility accepted by the manufacturers if the gate 

is not installed as instructed. Barrier Group 

do not

 warrant the work of 3rd party contractors. 

BEFORE YOU START

1. The installer must ensure the desired mounting point for the gate is level, plumb and rigid. 

2. Use fixings appropriate to the material into which they are being fixed (not included).  

3. Check all parts are included. Contact Barrier Group immediately if you are missing a piece.

AFTER INSTALLATION CARE 

Barrier Group recommends that you check the operation of your gate at least every six 
months (more regularly in extreme environments or frequent use). It is natural for spring 
assistance unit to lose tension over time. Adjustment may be required.

Reviews: