RDG603A9 - Issue 1 - Shire 14 Workboat Owners Manual 30, 40, 50
Page 18 of 40
18.
Installation Check list
Engine alignment correct, clearance all round, check propeller turns
by hand (Ensure ignition is off battery and battery master switch is
off)
Anti-Vibration mounts correct height, spacers if necessary
Exhaust system as specified
Battery leads are of correct size, tightened and start battery is
charged
Check tension of alternator belts, wiring connected and belt
alignment checked If removed
Check fuel system is connected correctly and primed
Fuel line water trap installed and water drained off
Check header tank and skin tank connections are correct way
round, constant pipework rise to header tank
Check level of coolant in header tank and correct ratio
All air has been bled from skin tank, calorifier and pipework
Engine and gearbox oil levels are as specified
Throttle and gear cables correctly adjusted and operating smoothly
All pipework and cabling supported and not chaffing, slack to allow
movement of engine
Confirm panel and warning lights operational
Check for leaks
Explain/Demonstrate off season storage and maintenance
Installer
’s signature
Installer name/company